Similar Projects
Last Updated | 02/14/2022 06:59 PM |
Project Title | Route 997 Transmission Main |
Physical Address | View project details and contacts |
City, State (County) | Chambersburg, PA (Franklin County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 |
Plans Available from | Municipal Agency - 01/03/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ITEM DESCRIPTION – ESTIMATED QUANTITY 01. 24" DIP, complete in place. 8,760 LF 02. 16" DIP, complete in place. 40 LF 03. 12" DIP, complete in place. 100 LF 04. 8" DIP, complete in place. 160 LF 05. 6" DIP, complete in place. 100 LF 06. 4" DIP, complete in place. 40 LF 07. 24" Beveled Gate Valve & Box, complete in place.11 EA 08. 24" Gate Valve & Box, complete in place. 6 EA 09. 12" Gate Valve & Box, complete in place. 2 EA 10. Fire Hydrant Assembly (Tee, Valve, 6" DIP, & Hydrant), complete in place. 11 EA 11. 24" Mechanical Joint Tee With Thrust Block, complete in place. 1 EA 12. 6" Mechanical Joint Tee With Thrust Block, complete in place. 2 EA 13. 4" Mechanical Joint Tee With Thrust Block, complete in place. 2 EA 14. 24"x12" Mechanical Joint Cross With Thrust Block, complete in place. 1 EA 15. 24"x8" Mechanical Joint Tee With Thrust Block, complete in place. 5 EA 16. 24"x6" Mechanical Joint Tee With Thrust Block, complete 1 EA in place. 17. 24" Mechanical Joint Cap With Thrust Block, complete in place. 1 EA 18. 6" Mechanical Joint Cap With Thrust Block, complete in place. 8 EA 19. 4" Mechanical Joint Cap With Thrust Block, complete in place. 4 EA 20. 24" 45 Degree Mechanical Joint Elbow With Thrust Block, complete in place. 4 EA 21. 24" 22.5 Degree Mechanical Joint Elbow With Thrust Block, complete in place. 6 EA 22. 16" 45 Degree Mechanical Joint Elbow With Thrust Block, complete in place. 2 EA 23. 12" 90 Degree Mechanical Joint Elbow With Thrust Block, complete in place. 2 EA 24. 6" 45 Degree Mechanical Joint Elbow With Thrust Block, complete in place. 1 EA 25. 24"x16" Mechanical Joint Reducer, complete in place. 1 EA 26. 8"x6" Mechanical Joint Reducer, complete in place. 3 EA 27. 8"x4" Mechanical Joint Reducer, complete in place. 2 EA 28. 24"x24" Tapping Sleeve & Valve With Thrust Block, complete in place. 1 EA 29. 16"x16" Tapping Sleeve & Valve With Thrust Block, complete in place. 1 EA 30. 12"x10" Tapping Sleeve & Valve With Thrust Block, complete in place. 2 EA 31. 6"x6" Tapping Sleeve & Valve With Thrust Block, complete in place. 3 EA 32. 4"x4" Tapping Sleeve & Valve With Thrust Block, complete in place. 2 EA 33. 24" Field-Lok Gaskets, complete in place. 98 EA 34. 16" Field-Lok Gaskets, complete in place. 2 EA 35. 12" Field-Lok Gaskets, complete in place. 6 EA 36. 8" Field-Lok Gaskets, complete in place. 10 EA 37. 6" Field-Lok Gaskets, complete in place. 16 EA 38. 3/4" Service Connection, complete in place. 76 EA 39. 2" Service Connection, complete in place. 1 EA 40. 3/4" Copper Service Pipe, complete in place. 2,000 LF 41. 2" Copper Service Pipe, complete in place. 20 LF 42. Stream Crossing, complete in place. 50 LF 43. Temporary Paving (Main Line), complete in place. 9,050 LF 44. Temporary Paving (Hydrants), complete in place. 100 LF 45. Temporary Paving (Service Connections), complete in place. 1,000 LF Total Base Bid (Sum of Items 01. through 45. ): $ Alternate No. 1 Description Estimated Quantity Unit Price Extended 1 Pavement Overlay, complete in place. 15,235 SY |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |