Last Updated | 08/01/2022 02:31 PM |
Project Title | Drainage Improvements at 34 Huspah Court N |
Physical Address | View project details and contacts |
City, State (County) | Seabrook, SC 29940 (Beaufort County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 1, 2022, bids were canceled. No definite date for the rebid. The intent of this project is to realign the ditch to the platted easement, which is coordinated with property lines. A naturally winding drainage conveyance divides the property addressed 34 Huspah Court N Seabrook, SC 29940. The intent of this project is to realign the ditch to the platted easement, which is coordinated with property lines. To do this, it is proposed 205' of the new, proposed drainage conveyance be piped, and the remaining 506' is to be open channel. Following implementation of the new channel, the old channel is to be filled with select fill. Construction drawings for this work have been prepared and can be found in Exhibit A. The work for this project includes, but is not limited to, the following: 1. Installation and layout of proper erosion and sediment control 2. Obtaining junction boxes, detailed in Exhibit B, from Knight's Precast, Summerville SC or equal supplier 3. Clearing and grubbing of non-specimen trees within easement and right of way areas 4. Excavation of new drainage conveyance 5. Construction surveying, as necessary 6. Installation of pipe in the channel along roadside right of way and where specified on plans 7. Saw cutting existing pipes and installation of junction boxes 8. Filling the existing channel to 95% of standard proctor with select fill 9. Site stabilization, including installation of permanent erosion and sediment control 10. Participation in preconstruction, closeout, and any other meetings deemed necessary by Beaufort County Stormwater 11. The project shall be completed within 180 days from notice to proceed 12. Provide submittals and shop drawings for review for all materials and equipment prior to incorporation into the project. 13. Call PUPS for utility locates prior to commencing any work. 14. Coordinate with the Utility Companies for the relocation of any utilities during construction. 15. Restoration of all disturbed areas including laydown 16. All Contractors, Sub Contractors, Vendors or any person or agency working on Beaufort County Property, easements, projects or real property shall follow all Beaufort County policies and procedures relating to operations, safety, environmental impacts, code of conduct, personal protective gear or any other policy designed to protect Beaufort County Employees, Beaufort County Citizens, property, contractor personnel, Vendor or sub-contractor personnel. 17. Work must comply with all local, state, and federal guidelines *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |