Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

I-75 Big Bend Road
Bidding
FL

I-75 MLK DDI
Bidding
FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

US 301 Bloomingdale
Post-Bid
FL

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Concrete Curbs, Sidewalks and Driveways - Various Locations
Results
Plant City, FL 33563

General Asphalt Resurfacing
Term Contract
Bidding
Temple Terrace, FL

Forest Brooke Subdivision, Phase 3C and Collector Road 2nd Extension, Phase 1
Post-Bid
Wimauma, FL

North Franklin and West English Streets Improvements
Results
Plant City, FL 33564

East Selmon Expressway Slip Ramps Design-Build
Bidding
Tampa, FL

CDBG Project for Streets Resurfacing
Post-Bid
Plant City, FL

Prequalification in Hot Plant-Mixed Bituminous Courses Required
Results
Less than $264,727 est. value
FL

South Coast Greenway Trail, Phase 1A - Shell Point (LAP)
Bidding
$2,249,150 est. value
Ruskin, FL 33570

Turkey Creek Road Project
Post-Bid
$3,000,000 est. value
Plant City, FL 33566

Last Updated 11/19/2020 02:20 AM
Project Title

Bike Path/Trail and Bike Lane/Sidewalk/Milling and Resurfacing/Drainage Improvements

Physical Address View project details and contacts
City, State (County) Temple Terrace, FL 33617   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,566,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

D720014B, D720014B, D720039B Improvements under this contract consist of two separate segments (FPID Nos. 439532-1-52-01 and 439532-2-52-01). The first segment of the Morris Bridge Road Project (FPID 439532-1) begins at Fowler Ave. and ends at Fletcher Ave. The improvements include milling & resurfacing, base work, shoulder treatments, drainage improvements, bike path/trail, sidewalk, guardrail, traffic signals, signing/pavement markings. The second segment of Morris Bridge Road improvements (FPID 439532-2) extends from Davis Rd. to Fowler Ave. The improvements include milling & resurfacing, base work, shoulder treatments, drainage improvements, sidewalk, traffic signals, signing/pavement markings. Both of the segments are located within the City of Temple Terrace, in Hillsborough County. Section 0001 Structures 0110- 3- Removal Of Existing Structures/Bridges (43953215201) Ls 1.000 0458- 1- 21 Bridge Deck Expansion Joint, Rehabilitation, Poured Joint With Backer Rod Lf 162.000 0515- 4- 1 Bullet Rail, Single Rail Lf 296.000 0515- 4- 2 Bullet Rail, Double Rail Lf 296.000 0521- 5- 13 Concrete Traffic Railing- Bridge, 36" Single-Slope Lf 296.000 0521- 6- 11 Concrete Parapet, Pedestrian/Bicycle, 27" Height Lf 296.000 Section 0002 Roadway 0101- 1- Mobilization (43953215201) Ls 1.000 0101- 1- Mobilization (43953215202) Ls 1.000 0101- 1- Mobilization (43953225201) Ls 1.000 0102- 1- Maintenance Of Traffic (43953215201) Ls 1.000 0102- 1- Maintenance Of Traffic (43953215202) Ls 1.000 0102- 1- Maintenance Of Traffic (43953225201) Ls 1.000 0102- 3- Commercial Material For Temporary Driveway Maintenance Cy 53.500 0102- 4- Pedestrian Special Detour (43953215201) Ls 1.000 0102- 4- Pedestrian Special Detour (43953225201) Ls 1.000 0102- 14- Traffic Control Officer Hr 512.000 0102- 60- Work Zone Sign Ed 38,100.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 148,050.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Fd 194,700.000 0102- 78- Temporary Raised/Retroreflective Pavement Marker Ea 1,197.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 1,056.000 0102-104- Temporary Signalization And Maintenance, Intersection Ed 500.000 0102-107- 1 Temporary Traffic Detection And Maintenance, Intersection Ed 500.000 0102-913- 31 Removable Tape, Yellow, Solid, 6" Gm 0.098 0104- 10- 3 Sediment Barrier Lf 21,667.000 0104- 11- Floating Turbidity Barrier Lf 612.000 0104- 12- Staked Turbidity Barrier- Nylon Reinforced Pvc Lf 82.000 0104- 15- Soil Tracking Prevention Device Ea 2.000 0104- 18- Inlet Protection System Ea 19.000 0107- 1- Litter Removal Ac 204.490 0107- 2- Mowing Ac 190.430 0108- 2- Monitor Existing Structures- Vibration Monitoring (43953215201) Ls 1.000 0108- 2- Monitor Existing Structures- Vibration Monitoring (43953225201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (43953215201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (43953215202) Ls 1.000 0110- 1- 1 Clearing & Grubbing (43953225201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 1,972.000 0110- 7- 1 Mailbox, f&i Single Ea 2.000 0120- 1- Regular Excavation Cy 5,052.700 0120- 6- Embankment Cy 7,557.600 0160- 4- Type b Stabilization Sy 21,513.000 0285-701- Optional Base, Base Group 01 Sy 13,288.000 0285-702- Optional Base, Base Group 02 Sy 103.000 0285-712- Optional Base, Base Group 12 Sy 1,981.000 0327- 70- 1 Milling Exist Asph Pavt, 1" Avg Depth Sy 39,504.000 0334- 1- 11 Superpave Asphaltic Conc, Traffic a Tn 330.900 0334- 1- 12 Superpave Asphaltic Conc, Traffic b Tn 1,041.600 0337- 7- 80 Asphalt Concrete Friction Course,Traffic b, Fc-9.5, Pg 76- 22 Tn 2,745.000 0339- 1- Miscellaneous Asphalt Pavement Tn 31.900 0400- 0- 11 Concrete Class Ns, Gravity Wall Cy 387.500 0425- 1-321 Inlets, Curb, Type p-2, 10` Ea 1.000 0425- 1-521 Inlets, Dt Bot, Type c,10` Ea 4.000 0425- 1-531 Inlets, Ditch Bottom, Type c Modified- Back Of Sidewalk, 10` Ea 4.000 0425- 1-541 Inlets, Dt Bot, Type d, 10` Ea 2.000 0425- 1-551 Inlets, Dt Bot, Type e, 10` Ea 8.000 0425- 2- 61 Manholes, p-8, 10` Ea 6.000 0430-175-115 Pipe Culvert,Optional Material,Round, 15"s/Cd Lf 9.000 0430-175-118 Pipe Culvert,Optional Material,Round, 18"s/Cd Lf 2,195.000 0430-175-124 Pipe Culvert,Optional Material,Round, 24"s/Cd Lf 134.000 0430-175-130 Pipe Culvert, Opt Material, Round, 30"s/Cd Lf 164.000 0430-175-136 Pipe Culvert, Opt Material, Round, 36"s/Cd Lf 296.000 0430-175-142 Pipe Culvert, Opt Material, Round, 42"s/Cd Lf 32.000 0430-518-100 Straight Concrete Endwalls, 18", Single, 0 Degrees, Round Ea 1.000 0430-524-200 Straight Concrete Endwalls, 24", Double, 0 Degrees, Round Ea 1.000 0430-530-100 Straight Concrete Endwalls, 30", Single, 0 Degrees, Round Ea 1.000 0430-536-100 Straight Concrete Endwalls, 36", Single, 0 Degrees, Round Ea 1.000 0430-542-100 Straight Concrete Endwalls, 42", Single, 0 Degrees, Round Ea 2.000 0430-611-225 u-Endwall With Baffles, Index 261/430-011, 1:3 Slope, 18"Pipe Ea 1.000 0430-830- Pipe Filling And Plugging- Place Out Of Service Cy 2.100 0430-982-125 Mitered End Section, Optional Round, 18" Cd Ea 3.000 0430-982-129 Mitered End Section, Optional Round, 24" Cd Ea 2.000 0430-984-125 Mitered End Section, Optional Round, 18" Sd Ea 2.000 0515- 1- 2 Pipe Handrail - Guiderail, Aluminum Lf 134.000 0515- 2-311 Pedestrian/ Bicycle Railing, Aluminum Only,42" Type 1 Lf 1,372.000 0520- 1- 7 Concrete Curb & Gutter, Type e Lf 236.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 1,095.000 0520- 2- 4 Concrete Curb, Type d Lf 55.000 0521- 72- 40 Shoulder Concrete Barrier, 38" Or 44" Height Lf 190.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 3,497.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 484.000 0524- 1- 29 Concrete Ditch Pavement, 4", Reinforced Sy 187.000 0527- 2- Detectable Warnings Sf 825.000 0530- 3- 4 Riprap, Rubble, f&i, Ditch Lining Tn 362.000 0530- 74- Bedding Stone Tn 390.000 0536- 1- 1 Guardrail -Roadway, General Tl-3 Lf 454.000 0536- 6- Pipe Rail For Guardrail Lf 235.000 0536- 7- 3 Special Guardrail Post- Encased Post For Shallow Mount Ea 2.000 0536- 8- 13 Approach Transition Connection To Rigid Barrier, Furnish And Install, Tl-3 Ea 4.000 0536- 73- Guardrail Removal Lf 353.000 0536- 85- 24 Guardrail End Treatment- Parallel Approach Terminal Ea 4.000 0550- 10-220 Fencing, Type b, 5.1-6.0`, Standard Lf 607.000 0570- 1- 2 Performance Turf, Sod Sy 37,076.000 0571- 1- 12 Plastic Erosion Mat, Trm, Type 2 Sy 156.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 0.160 0710- 11-123 Painted Pavement Markings, Standard, White, Solid For Crosswalk And Roundabout, 12" Lf 1,682.000 0710- 11-125 Painted Pavement Markings, Standard, White, Solid For Stop Line Or Crosswalk, 24" Lf 571.000 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 2.952 0999- 25- Initial Contingency Amount, Do Not Bid (43953215201) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (43953215202) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (43953225201) Ls 1.000 Section 0003 Signing 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 136.000 0700- 1- 12 Single Post Sign, f&i Ground Mount, 12-20 Sf As 5.000 0700- 1- 50 Single Post Sign, Relocate As 4.000 0700- 1- 60 Single Post Sign, Remove As 76.000 0700- 2- 60 Multi- Post Sign, Remove As 4.000 0700- 3-101 Sign Panel, Furnish & Install Ground Mount, Up To 12 Sf Ea 3.000 0700- 3-601 Sign Panel, Remove, Up To 12 Sf Ea 5.000 0705- 10- 1 Object Marker, Type 1 Ea 12.000 0705- 10- 3 Object Marker, Type 3 Ea 4.000 0705- 11- 1 Delineator, Flexible Tubular Ea 25.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 10.000 0710- 90- Painted Pavement Markings, Final Surface (43953215201) Ls 1.000 0710- 90- Painted Pavement Markings, Final Surface (43953225201) Ls 1.000 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 2,902.000 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" For Diagonals And Chevrons Lf 100.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 411.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10gap Extension, 6" Gm 0.240 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 32.000 0711- 11-180 Thermoplastic, Standard, White, Yield Line Lf 30.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 501.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6" Gm 0.028 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 2,130.000 0711- 14-160 Thermoplastic, Preformed, White, Message Ea 12.000 0711- 14-170 Thermoplastic, Preformed, White, Arrow Ea 12.000 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 4.154 0711- 16-102 Thermoplastic, Standard-Other Surfaces, White, Solid, 8" Gm 0.121 0711- 16-131 Thermoplastic, Standard-Other Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 0.029 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" Gm 4.019 0713-103-101 Permanent Tape, White, Solid, 6" For Concrete Bridges Gm 0.098 0713-103-201 Permanent Tape, Yellow, Solid, 6" For Concrete Bridges Gm 0.098 0713-107- Preformed/Permanent Tape, Remove Sf 516.000 Section 0004 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 270.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 176.000 0632- 7- 1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install Pi 1.000 0634- 4-153 Span Wire Assembly, f&i, Two Point, Box Or Drop Box Pi 1.000 0634- 4-600 Span Wire Assembly, Remove- Poles Remain Pi 1.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 8.000 0641- 2- 12 Prestressed Concrete Pole, f&i, Type p-Ii Service Pole Ea 1.000 0646- 1- 40 Aluminum Signals Pole, Relocate Ea 4.000 0646- 1- 60 Aluminum Signals Pole, Remove Ea 2.000 0650- 1- 19 Vehicular Traffic Signal, Furnish & Install Aluminum, 5 Section Cluster, 1 Way As 1.000 0650- 1- 70 Vehicular Traffic Signal, Relocate- Includes Removal Andreinstallation As 17.000 0653- 1- 12 Pedestrian Signal, Furnish & Install Led Countdown, 2 Ways As 2.000 0653- 1- 60 Pedestrian Signal, Remove Ped Signal- Pole/Pedestal To Remain As 2.000 0654- 2- 22 Rectangular Rapid Flashing Beacon, Furnish & Installsolar Powered, Complete Sign Assembly- Back To Back As 4.000 0660- 1-103 Loop Detector Inductive, f&i, Type 3 Ea 1.000 0660- 2-101 Loop Assembly- f&i, Type a As 7.000 0660- 2-106 Loop Assembly, f&i, Type f As 2.000 0665- 1- 40 Pedestrian Detector, Relocate Ea 4.000 0670- 5-400 Traffic Controller Assembly, Modify As 1.000 0700- 3-201 Sign Panel, Furnish & Install Overhead Mount, Up To 12 Sf Ea 1.000 0700- 3-401 Sign Panel, Install, Up To 12 Sf Ea 3.000 0700- 5- 50 Internally Illuminated Sign, Relocate Ea 4.000 0715- 1- 12 Lighting Conductors, f&i, Insulated, No.8 - 6 Lf 1,142.000 0715- 4- 11 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 30` Mounting Height Ea 2.000 0715- 4- 12 Light Pole Complete, Furnish & Install Standard Pole Standard Foundation, 35` Mounting Height Ea 2.000 0715- 7- 11 Load Center, f&i, Secondary Voltage Ea 1.000 0715- 7- 21 Load Center, Rework, Secondary Voltage Ea 1.000 0715-500- 1 Pole Cable Distribution System, Furnish And Install, Conventional Ea 4.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents