Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

2021 LMIG Resurfacing
Infrastructure
Post-Bid
Hinesville, GA

Southern Region Disaster Recovery Support BPA
Results

Indefinite Delivery Indefinite Quantity Paving - Fort Stewart/Hunter Army Air Field, GA
Results
$10,000,000 to $40,000,000 est. value
Fort Stewart, GA

T32 - District 5 Routine Maintenance Services
Infrastructure
Post-Bid
Baconton, Evans, GA 30809

Azalea Street Redevelopment Phase III
Results
Less than $420,000 est. value
Hinesville, GA 31313

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Mt. Olivet Church Road Roadway Improvements
Results
Hinesville, GA 31313

Gum Branch Solid Waste Convenience Center
Infrastructure
Post-Bid
GA

Roadway Improvements for Youmans Road
Results
Hinesville, GA 31313

Speed Table Construction
Results
Hinesville, GA 31313

Pioneer Road Roadway Improvements
Results
Less than $146,539 est. value
Hinesville, GA

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Intersection Improvements on US 84/SR 38 at Old Sunbury Rd (CR 73)
Results
GA

Last Updated 02/15/2022 08:38 AM
Project Title

Bill Carter Road Roadway Improvements

Physical Address View project details and contacts
City, State (County) Midway, GA 31320   (Liberty County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work to be done consists of furnishing all materials, equipment and labor for the rehabilitation of Bill Carter Road. More specifically the work consists of the full depth reclamation of Bill Carter Road and the installation of an asphalt surface. Bill Carter Road is a two-lane roadway that is 24 feet in width and approximately 6,000 feet in length.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents