Similar Projects
Hyde Park Water and Wastewater Pipeline Renewal
Infrastructure
Bidding
$7,899,849 est. value
Austin, TX 78799

Hyde Park Water and Wastewater Pipeline Renewal
Infrastructure
Bidding
$7,899,849 est. value
Austin, TX 78799

Water Utility Meters and Monitoring Systems
Post-Bid
Austin, TX 78759

ABIA Detention Pond
Post-Bid
$700,000 est. value
Austin, TX 78719

Southern Region Disaster Recovery Support BPA
Results

Colton Bluff Drainage and Wastewater Improvements
Results
Austin, TX 73301

West Pecan Street at Heatherwilde Boulevard Project
Infrastructure
Bidding
Pflugerville, TX 78660

Construction of Morningstar Phase 3, Section 4 and Phase 4, Section 1 and 2 Subdivision
Post-Bid
Austin, TX

Gulf Coast Plant No. 1 Post Hurricane Harvey Downstream Repairs Phase III
Results
Less than $401,922 est. value
Austin, TX 78767

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Travisso Phase 4, Sections 4 and 5 - Clearing Plan
Post-Bid
TX

System-Wide Performance Based Maintenance Contract
Term Contract
Results
Less than $51,426,072 est. value
Austin, TX 78705

Spanish Oaks Golf Club Site and NPS Plan
Post-Bid
Bee Cave, TX 78738

Lakeway Highlands Phase 3 Section 6B
Results
TX

Ridge at Blackhawk Phase 1 Sections 1 and 2 - Street Drainage, Utility Improvements
Post-Bid
TX

Last Updated 09/10/2021 03:36 PM
Project Title

Construction of Salerno Phase 8

Physical Address View project details and contacts
City, State (County) TX   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of construction of Street, Drainage, Water, Wastewater and Erosion Control Improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents