Similar Projects
Signal Contract 2021 and 2022
Infrastructure
Design
$1,400,000 CJ est. value
Angelica, NY 14709

Bridge Painting at 30 (BIN) Locations
Infrastructure
Design
$6,705,540 CJ est. value
Buffalo, NY 14209

RFP - Buffalo Waterfront Grounds Management
Term Contract
Bidding
Buffalo, NY 14202

RFP - Buffalo Waterfront Public Space Management
Term Contract
Bidding
Buffalo, NY 14202

Demolish Building 5
Demolition, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Albany, NY 12208

Horseshoe Pond Dam Removal and Stream Restoration
Demolition, Infrastructure
Sub-Bidding
$250,000 CJ est. value
Schroon Lake, NY 12870

Water Testing and Supervision of Water Supply Systems
Term Contract
Post-Bid
Lagrangeville, NY

Term Contract for Asbestos Abatement Services
Term Contract
Post-Bid
Buffalo, NY 14203

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Contract #1 - Asbestos and Lead-Based Paint Abatement
Term Contract, Infrastructure
Construction
$13,750 CJ est. value
Vestal, NY 13850

Contract #2 - Asbestos and Lead-Based Paint Abatement
Term Contract, Infrastructure
Construction
$13,750 CJ est. value
Johnson City, NY 13790

Environmental Management (EM) West Valley Demonstration Project (WVDP) Phase 1B Contract
Term Contract
Design
West Valley, NY 14171

Science III Phase I Demolition & Asbestos Abatement
Term Contract, Demolition, Infrastructure
Sub-Bidding
$55,000 CJ est. value
Binghamton, NY 13902

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Last Updated 02/22/2023 08:02 PM
Project Title

Pressure Independent Control Valves and Asbestos Abatement - Rebid

Physical Address View project details and contacts
City, State (County) New York, NY 11201   (Kings County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,194,200 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

" All bids were Rejected on this project." Contract Terms April 28, 2023 Location Where Goods to be Delivered or Service Performed New York City College of Technology, 300 Jay Street, Brooklyn, New York 11201 Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law 139-j and 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and ccontracts@dasny.org. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority' for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any. Provide all labor, materials and equipment required with the installation of pressure independent control valves at (49) air handling units chilled water piping and two new differential pressure transmitters at the end of the mains. Estimated Cost Range: $1,950,000 - $2,150,000 The Dormitory Authority of the State of New York ("DASNY") has determined that its interest in obtaining the best work at the lowest possible price, preventing favoritism, fraud and corruption, and other considerations such as the impact of delay, the possibility of cost savings advantages and any local history of labor unrest are best met by use of a Project Labor Agreement ("PLA") on this Project. The successful low bidder, as a condition of being awarded this Contract, will be required to execute the PLA described in the Information for Bidders and included in the Contract Documents. See Section 18.0 of the Information for Bidders of the Contract Documents for additional information. All subcontractors of every tier will be required to agree to be bound by the PLA. 3607609999_10158, 3607609999/CR# 02, LEA - 10158

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents