Similar Projects
Oak and Buzzell Street, Sewer and Storm Improvements
Results
Saint Johnsbury, VT

2020 Hickok Street and West Lane Sewer and Storm CCTV
Results
Winooski, VT 05404

TAP16(5) Detention Pond Retrofit
Results
$300,000 to $500,000 est. value
Essex, VT

Wastewater System Upgrade - Request for Statement of Qualifications for Engineering Services
Post-Bid
Bolton Valley, VT 05477

Stormwater Maintenance Program Pipe Lining 2021
Post-Bid
Colchester, VT

GSI/CSO: South End Retrofits
Post-Bid
Burlington, VT

Colchester Police Station Outfall Repair
Results
$44,000 est. value
Colchester, VT 05446

Orchard Street and Water Tower Road Sewer and Stormwater Improvements
Results
$151,633 est. value
Enosburg Falls, VT

Northwest Neighborhood Sewer Separation - Phase 1A
Results
$2,000,000 est. value
Rutland, VT 05702

Stormwater Reduction in the Town of Brandon (Neshobe River Watershed)
Results
$36,800 est. value
Brandon, VT

Berlin Town Offices and Garage Stormwater Improvements
Results
$50,000 est. value
Berlin, VT 05602

Mountainside Condominiums Drainage Improvements
Renovation
Post-Bid
Warren, VT 05674

10 Lincoln Street Stormwater Improvements
Results
$42,000 est. value
Springfield, VT 05156

Last Updated 05/20/2021 03:14 PM
Project Title

GSI/CSO - South End Retrofits

Physical Address View project details and contacts
City, State (County) State-Wide: VT
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of both surface and subsurface Green Stormwater Infrastructure in the City’s public right-of-way located within the vicinity of Prospect Parkway, South Street, Fairmount Street, and South Prospect Street. Construction teams that can perform all aspects of the retrofit projects including excavation, traffic control, site maintenance, installation of subsurface stormwater infiltration systems, installation of stormwater bioretention systems, installation of subsurface structures, landscaping, installation of curbing and sidewalks, paving restoration, connecting to existing sewers and all other tasks necessary for a complete project in accordance with the contract documents. Contract Drawings accompany these bid documents which depict the proposed work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts