Similar Projects
Preventive Maintenance of Boiler Systems and Ancillary Equipment
Term Contract
Bidding
Utica, NY 13502

2021 - 2025 Heat and Hot Water Services
Bidding

Removal and Replacement of Boiler, Oil Burner, Circulator Motor and Associated Piping and Insulation
Post-Bid
South Salem, NY 10590

Mechanical, Plumbing and Electrical Work for the Lower Wappinger Creek Community Boat House
Post-Bid
Wappingers Falls, NY 12590

Z--528-18-S112 Install Mixing Valves in Building 1 of Buffalo VAMC. Remove the Old Rubber Angle Stops and Add Ceramic Angle Stops as Well as Associated Connections.
Results
$250,000 to $500,000 est. value
Bullville, NY 14215

Boiler Maintenance for Housing Contract
Results
Watervliet, NY

Senior Center Boiler Replacement
Bidding
Less than $25,000 est. value
Clifton Park, NY 12065

BSA Bird Island Wastewater Treatment Plant Boiler Deaerator System Improvements
Post-Bid
Buffalo, NY 14202

Lansing Central School District - Reconstruction to Senior High School
Results
Lansing, NY

Furnish Steam to Water Domestic Hot Water Heaters
Bidding
Rochester, NY 14614

Gun Tube Heat Treat Furnace Replacement at the Watervliet Arsenal, NY
Post-Bid
$25,000,000 to $100,000,000 est. value
Watervliet, NY

Q--SPS RO Water System Service 528A7
Results
Syracuse, NY 13210

North Rockland High School Rooftop HVAC - Annex UV Replacement G. Neary Boiler Replacement
Bidding
Haverstraw, Thiells, NY 10927

Granular Activated Carbon and Carbon Filter System Gravel Replacement - Project 4
Post-Bid
Niagara Falls, NY 14304

Annual Boiler/Burner Cleaning and Maintenance
Results
Pearl River, NY 10965

Reported 01/29/2021 12:00 AM
Project Title

Furnish Boiler Tube Replacement as Specified

Physical Address View project details and contacts
City, State (County) Syracuse, NY   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To remove existing boiler tubes and install 220 new boiler tubes each in two (2) A.B.C.O. Heat Recovery Steam Generators (HRSG) as specified and shown herein. The water tube HRSG boilers are configured as shown on the attached drawing. Heat recovery is from flue gas produced through the incineration of Solid Waste. Flue gas particulate deposits on the gas side of the boiler tubes and gas side boiler structure in the form of “slag”. This slag contains lead, cadmium and possibly arsenic. The Owner will clean the boiler by means of sandblasting. However, there may be residual slag in the boiler gas side and the Contractor should be prepared to provide proper PPE for his employees. The Owner has installed a central “breathing” air system, which may be utilized by the Contractor. Tubes to be replaced are rows 8 through 17 (10 rows total, 22 tubes per row) on the hot gas (east side) inlet side of the boiler. The HRSG boilers have removable panels on one side only (approximately 13 feet high by 8 feet wide) for easy access to the tubes. Panels will be opened by the Owner.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents