Similar Projects
Maple Hill
New Construction
Design
Franklin, MA 02038

North Hill Needham - Site Plan Improvements
New Construction
Design
Needham, MA 02492

Heritage Park Renovation
Infrastructure
Bidding
$300,000 CJ est. value
Weymouth, MA 02188

Cassidy Field Parking Lot Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Medway, MA 02053

Tri-Town Regional Water Treatment Plant - Sub Bid
New Construction, Infrastructure
Sub-Bidding
$70,000,000 CJ est. value
Braintree, MA 02184

Tri-Town Regional Water Treatment Plant - Sub Bid
New Construction, Infrastructure
Sub-Bidding
$70,000,000 CJ est. value
Braintree, MA 02184

Eastern Avenue, Pine Street, Schiller Road, Ridge Avenue, and Boston-Providence Turnpike Water Main Replacements
Post-Bid
$1,950,000 est. value
Dedham, MA

Complete Streets Improvements Along Eastern Avenue and East Street
Post-Bid
Dedham, MA 02026

Roadway Reconstruction (Including Bridge Replacement, Culvert Extension and Signals) Along A Section of Route 1A (Main Street)
Results
Less than $20,101,404 est. value
Walpole, MA 02081

Resurfacing and Related Work (Including 5 Bridges) Along A Section of Interstate 495N
Results
Less than $5,479,327 est. value
Foxborough, Plainville, Wrentham, MA

Spring Street Solar
New Construction
Construction
Franklin, MA

Maple Street Solar
New Construction
Construction
Less than $1,791,080 est. value
Bellingham, MA

Dedham Country Day School Classroom Addition
Addition, Demolition, Infrastructure
Pending Verification
$500,000 CJ est. value
Dedham, MA 02026

Chipotle / Medfield
New Construction, Infrastructure - 2,325 SF
Pending Verification
$600,000 CJ est. value
Medfield, MA 02052

Courtyard Drainage Repair Project
Infrastructure
Design
$325,000 CJ est. value
Franklin, MA 02038

Last Updated 08/08/2022 11:43 AM
Project Title

Watermain Improvements Project

Physical Address View project details and contacts
City, State (County) Milton, MA 02186   (Norfolk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $2,354,330 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract will consist of, but is not limited to the relaying of existing watermain with ductile-iron watermain on Audubon Road, Elm Street, Dean Road, Cabot Street and Pilgrim Road for a total of approximately 6,900 linear feet of 6-inch to 12-inch watermain and all related valves, hydrants, service connections, bypass piping, temporary pavement and safety signs. The Bidding and award of this contract shall be in full compliance with MA General Laws Chapter 30, Section 39M as last revised. Estimated Cost $2.0 Million Piping, Temporary Pavement and Safety Signs

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents