Similar Projects
Stono Shores Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Charleston, SC 29412

New District 10 Elementary School - Charleston County School District
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Charleston, SC 29401

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Huger Street Hotel
New Construction, Infrastructure
Design
$37,000,000 CJ est. value
Charleston, SC 29403

Road Work - Otranto Road and Deerwood Drive Intersection Improvements CTC
Infrastructure
Bidding
$2,000,000 CJ est. value
North Charleston, SC 29406

Galeana Chrysler Dodge Ram Jeep / Mount Pleasant
New Construction, Infrastructure
Post-Bid
Awendaw, SC 29429

FLETC Training Venue Replication
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
North Charleston, SC 29405

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Spinx #368 / Charleston
New Construction, Infrastructure - 4,000 SF
Construction
$3,000,000 CJ est. value
Charleston, SC 29401

The Hamlet at Maybank Highway / Johns Island
New Construction, Infrastructure
Construction
$30,000,000 CJ est. value
Johns Island, SC 29455

Cumberland Residential - The Clarke
Demolition, New Construction, Infrastructure - 3,000 SF
Pending Verification
$10,000,000 CJ est. value
Charleston, SC 29401

Golden Grove Residential Phase 1
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Ravenel, SC 29470

New District 20 Middle School - Charleston County School District
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Charleston, SC 29403

Grace Episcopal Church Parish Hall
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Charleston, SC 29401

Last Updated 09/05/2023 03:02 PM
Project Title

Spring-Fishburne Drainage Basin Improvements Phase 5 - Pump Station - City of Charleston

Physical Address View project details and contacts
City, State (County) Charleston, SC 29401   (Charleston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $37,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.charleston-sc.gov/DocumentCenter/View/33741/Official-Budget-Book---2023- This is the last phase of the Spring-Fishburne meta-project. This phase includes the purchase and installation of 3 main stormwater pumps capable of pumping in excess of 120,000 gallons per minute of water out of the connected stormwater system. Project is included City of Charleston FY 2023-2027 CIP Page 413 ______________________________ Phase 5 consists of a new pump station between the Ashley River Bridges and the placement of 3 pumps, each capable of displacing 120,000 gallons of water per minute. Diesel engines will power the pumps, eliminating the dependence on electrical power during storm events. As of October 12, 2022, this project is currently in the FY 2022-2026 CIP. A design firm has been selected for the project. Information regarding the contactor selection has not been disclosed. Construction is estimated to take place in Q4 of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents