Similar Projects
As Needed Plumbing Maintenance and Repair for Metropolitan's Iron Mountain Pumping Pump Plant Housing
Term Contract
Bidding
$240,000 est. value
Los Angeles, CA

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Bidding
$240,000 est. value
Los Angeles, CA

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Water Bottle Filling Station Project Phase I
Alteration
Bidding
$40,000 est. value
West Sacramento, CA

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

As-Needed Plumbing Repair Services for Metropolitan's Hinds Pumping Pump Plant Housing
Term Contract
Bidding
Less than $95,000 est. value
Los Angeles, CA

"As Needed" Plumbing Services
Term Contract
Post-Bid
Eureka, CA 95501

Orchard Dale Elementary School Modernization Project- Plumbing
Alteration
Results
Whittier, CA 90603

As-Needed Plumbing Repair Services for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract
Bidding
Los Angeles, CA

Plumbing Contractor Services
Term Contract
Post-Bid
Concord, CA

Industrial Water Treatment Services
Alteration
Results
$100,000 est. value
San Diego, CA

Reported 05/06/2022 12:00 AM
Project Title

Marina Manor Senior Public Housing Development Buildings I and II Pipe Coating Project

Physical Address View project details and contacts
City, State (County) Marina del Rey, CA 90292   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project includes: Water quality testing before and after coating Pressure testing of the water supply pipes before and after Removal of build-up corrosion, scale, rust inside existing plumbing pipes - maximum grit size 12. Removal of abrasive materials used to removal build-up Application of approved epoxy coating lining of plumbing pipes Replacement of all Shower/Tub cartridges and stem valves Replacement of all Angle valve shut-off at hot and cold outlets Replacement of all Flex water supply lines Replacement of all Faucet aerators Minimum number of valves Removal of all handles on existing valves epoxied open Verification of an even coat application by picture, minimum two locations New pipe "T" to be installed vertically Repair damaged wall areas with green board Patch and paint as necessary - touch up

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents