Similar Projects
Resurface and Guardrail Upgrades
Infrastructure
Bidding
$2,500,000 est. value
Hillsboro, MO

City of Atlanta Street Improvements
Infrastructure
Bidding
$500,000 est. value
Atlanta, MO

Pavement Crack Filling, Patching, Resealing, and Restripping Paved Surfaces
Infrastructure
Post-Bid
Bourbon, MO 65441

Kennett 2021 Street
Infrastructure, Alteration
Post-Bid
Kennett, MO

2021 Mill, Mat and Asphalt Overlay Program
Results
Festus, MO

Route 9 Improvements
Results
Parkville, MO 64152

Plant Mix Bituminous Paving 2022
Infrastructure
Bidding
$200,000 est. value
Jackson, MO

63rd Street Reconstruction - Woodland Avenue to Prospect Avenue
Infrastructure
Post-Bid
Kansas City, MO 64121

SLBE 73rd St Jefferson to Pennsylvania Ave
Renovation
Results
Less than $49,275 est. value
MO

Asphalt Crack Sealing, Sealcoat, and Striping
Infrastructure
Bidding
$45,000 to $49,000 est. value
O'Fallon, MO

Paving & Engine Room
Infrastructure
Post-Bid
Breckenridge Hills, MO 63114

2021 Asphalt Overlay Program
Results
Tarkio, MO

Milling and Overlay for Columbia Streets - Multi Year
Term Contract
Post-Bid
Columbia, MO

Pavmaster by Gilcrest 414 Tow Type Paver
Infrastructure
Results
MO

Asphalt and Concrete Repair and Replacement Services
Infrastructure, Alteration
Post-Bid
Liberty, MO

Last Updated 05/11/2022 06:12 AM
Project Title

Resurface

Physical Address View project details and contacts
City, State (County) MO   (Macon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Route 149 Macon County. Resurface From Route 139 in Downing to Adair County Line 1.0 Mile South of Route T, the Total Length of Improvement Being 16.005 Miles.(2): Job J2mamd15 Route Oo Macon County. Resurface From Hornet Street in Barnesville to Route O in Bloomington, the Total Length of Improvement Being 8.393 Miles

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents