Similar Projects
Water, Sewer and Street Improvements
Infrastructure
Bidding
Dodge, ND

Highway 52 Water Main Replacement
Infrastructure
Bidding

Notice and Comment Opportunity - McKenzie County Water Resource District, System IV Part IV Rural Water Distribution Forest Service Project
Term Contract
Post-Bid
ND

Paving and Utility District 2021-1
Results
$2,308,000 est. value
Minot, ND 58703

2021 Water Main Replacement Burdick Expressway
Results
$656,000 est. value
Minot, ND

Replat of West Ridge 1st Street Improvements
Term Contract, Infrastructure
Bidding
Dickinson, ND

2021 Water Main Replacement
Renovation
Results
$2,050,000 est. value
Minot, ND

Water Reservoir Replacement 2021
Results
$1,095,000 to $3,421,095 est. value
Hazen, ND

Mountrail Phase 2 Transmission Line
Infrastructure
Results
$1,987,000 est. value
Minot, ND

2021 High Street Water and Sewer Extension
Infrastructure
Results
$1,300,000 est. value
Killdeer, ND 58640

Stanley Phase 1 Capital Improvements Plan
Infrastructure
Results
$5,800,000 to $6,050,000 est. value
Stanley, ND

Landfill Entrance Improvements, Interior Roadway and Watermain
Infrastructure
Results
Minot, ND

Construction of the North Broadway Water System Improvements Project
Infrastructure
Results
$923,000 est. value
Minot, ND

2021 System I North Expansion Project
Infrastructure
Results
$3,000,000 est. value
Watford City, ND

24th Street Southwest Sanitary and Water Main Improvements
Infrastructure
Results
Minot, ND 58701

Last Updated 03/01/2022 08:25 AM
Project Title

Advanced Metering Infrastructure

Physical Address View project details and contacts
City, State (County) (Dunn, McKenzie, McLean, Mercer, Mountrail, Ward Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,032,671
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Fort Berthold Indian Reservation is located in six counties in north central/northwest North Dakota that supplies potable water to tribal and non-tribal entities. The Fort Berthold Rural Water System is in most of those six counties. The service area extends from the central part of North Dakota to the northwestern part of the state, including all or parts of Dunn, McLean, Mercer, Mountrail, McKenzie, and Ward counties, covering 1,530 square miles. The purpose of this RFP is to allow the owner to select an Advanced Metering Infrastructure (AMI) for the following purposes: 1. Acquire water meter data acquisition equipment and data management software/interface. 2. Installation of the supplied equipment along with technical support during and after the warranty phase of the AMI Installation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents