Similar Projects
Construction of Two New Water Well Houses - Chlorination Rooms
New Construction, Infrastructure
Post-Bid
Shawnee, OK 74801

2020 CDBG Reap Water System Improvements
Infrastructure
Bidding
$420,000 est. value
Kenefic, OK

Well Plugging
Post-Bid
Oklahoma City, OK

Lawton Groundwater Supply - Treatment Pilot
Results
$305,000 est. value
Lawton, OK 73501

Installation of Six (6) Groundwater Monitoring Wells
Results
OK

Reported 06/16/2021 12:00 AM
Project Title

Semi-Permanent Submersible Chopper Pump

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74012   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installing of a Semi-permanent Submersible Chopper Pump with connections to force main to be installed at our Expressway Lift Station located at 1313 N. 6th Street in Broken Arrow. This will be a turnkey operation to include connection to the existing control panel and SCADA system or install a new control panel. In either case, the pump needs to be on our SCADA system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents