Similar Projects
Lowe House - Grounds, Drainage, and Pavement Repairs and Improvements
Bidding
Huntsville, AL 35899

Stickney Reservoir Improvements
Bidding
Mobile, AL

Gibbs Village East and West Erosion Control/Sidewalk Improvements
Post-Bid
Montgomery, AL

6th Avenue Drainage Project
Post-Bid
Less than $2,500,000 est. value
Birmingham, AL 35203

2018 Neighborhood Improvements
Results
Haleyville, AL 35565

McDuffie Bulkhead Replacement
Results
Mobile, AL

Street and Drainage Rehabilitation for the East Lake Community
Bidding
Guntersville, AL

Design and Construction of a Slope Failure Repair
Post-Bid
Scottsboro, AL

Star Lake Improvements
Results
$250,000 to $400,000 est. value
Hoover, AL 35216

Guntersville East Lake Community Street and Drainage Rehabilitation
Bidding
$483,000 est. value
Guntersville, AL

Azalea City Golf Course - Grading and Drainage Improvements
Post-Bid
Mobile, AL 36608

Showa-Best Glove - Plant Expansion
Results
Less than $550,000 est. value
Fayette, AL

Simmons Street Drainage Replacement
Bidding
$1 to $180,000 est. value
Elba, AL 36323

Gulf of Mexico Artificial Reef Construction Project
Post-Bid
Gulf Shores, AL 36457

Bethel Avenue and Georgia Street Capping and Drainage Improvement Project
Results
Tarrant, AL

Last Updated 03/01/2021 08:16 AM
Project Title

John Hunt Park Pond Liner

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35801   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall prepare subgrade of bottom of pond and maintenance including any dewatering of the area to be lined. Contractor shall supply and install 12 oz. non-woven geotextile over a prepared subgrade and up wall sides to anchor trench (see detail 1/l1.5). Contractor shall be responsible for their own takeoff for final square foot amount of geotextile and liner required. Contractor shall verify all dimensions in field of wall heights and bottom of pond elevations. Contractor shall supply and install a 45 MIL reinforced polypropylene liner. Pricing to include installation of ¼” x 2” 304 SS batten bar to mechanically seal liner to 32” reinforced concrete connector pipe from pond two to pond one. See drawings for additional requirements

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents