Similar Projects
Chapman Southport Residential
New Construction
Conception
Washington, PA 15301

Franklin Avenue Income Restricted Homes
New Construction
Conception
Bloomsburg, PA

The Enclave at Ellis Woods
New Construction - 36,400 SF
Design
$15,000,000 est. value
Pottstown, PA 19465

Fox Brooke
New Construction
Design
$10,000,000 est. value
Lancaster, PA 17602

Scott Street Development Project
Renovation
Bidding
Williamsport, PA 17701

Tall Grass Meadows - Phase II
New Construction - 315,000 SF
Sub-Bidding
$25,000,000 est. value
Abbottstown, PA 17301

Mayberry at Stewartstown - Phase 1
New Construction - 114,000 SF
Sub-Bidding
Stewartstown, PA 17401

Montgomery Gardens Single Family Homes
New Construction
Post-Bid
Warrington, PA 18976

Orchard View Subdivision
New Construction - 90,000 SF
Post-Bid
State College, PA 16801

General Renovation Project - General Construction - Contract - Shaner/Apellet 2019.1.GC
Renovation
Results
Irwin, PA 15642

Sorrentino Home Renovation
Renovation
Results
Clifton Heights, PA 19018

Center Square Residential Care
New Construction
Construction
Worcester, PA 19490

Laurel Pointe Phase II
New Construction
Construction
Cranberry Township, PA 16066

Stoney Brook - Phase 3A
New Construction - 30,330 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Elizabethtown, PA

Stoney Brook - Phase 3A
New Construction - 30,330 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Elizabethtown, PA

Reported 02/17/2022 12:00 AM
Project Title

Scattered Sites - Liberty Avenue Exterior Renovations Project

Physical Address View project details and contacts
City, State (County) Waynesburg, PA   (Greene County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work is separated into three prime contracts: General, Plumbing & Electrical Construction. The scope of work consists of the following: Roofs-Demo existing shingle roofs, felt paper, drip edge and damaged sheathing. Construct new overhangs on building gables & replace gable vents at siding, replace alum. gable vents at brick veneer. New architectural shingle roofs, felt paper, ice shield, drip edge, gutter apron, gutters and downspouts. Replace roof penetration boots and rain rings. Walls-Remove and replace existing siding, house wrap, trim, soffit and fascia. Remove and replace existing windows along with related blocking and trim, exterior entrance doors & storm doors (infill framing 7`-0" door to 6`-8" door). Clean, repair and seal existing brick veneer Porches-Front Porches; Demo and replace front concrete porches with new slab raised to door threshold height. New stairs and railings. Rear Patio and Porch- Remove existing concrete pad at rear door. New concrete patio raised to door threshold height. New shed roof along with supports for covered patio. Covered patio to include framing, roofing, siding and finished ceiling. Vent Piping-Extend existing vent piping (rear of apartment unit) through roof of covered patio Site-Tree & stump removal Demo and replace existing concrete sidewalk, curb and stairs along with handrail, metal clothesline T`s with concrete bases/asphalt. Reconfigure parking area to include a HC driveway/space and new parking spaces. Import topsoil and regrade site. Install roof drain collection system and French drains. Provide boundary fence at hillside. Electric/Telephone/Cable. Remove and replace porch packs and eliminate wall packs. Remove existing streetlamp at the parking area & provide alternate site lighting (4 decorative pole lights along sidewalk) with photocells. Replace existing power supply. Provide two sets of gang meters (1 meter for each unit and one meter on each building for HA with a GFI outlet with lock and cover; 4 meters per building). Provide new wiring and conduit, underground to each unit. Fix cable & phone line entrance boxes on exterior of buildings. Plumbing-Replace & relocate main site water shut-off and eliminate water meter pit. Provide shut-off and meters at each apartment unit Gas-Demo existing gas master meter and install two sets of gang meters (1 meter for each unit, 3 per meters per building). Replace gas lines to each apartment unit Contract No.: PA 45-06.

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents