Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

Ardrey Kell Rd
Bidding
$1,088,000 est. value
Charlotte, NC

City View Mcalpine Stream Project
Bidding
$817,433 est. value
Charlotte, NC

Toby Creek and Mallard Creek Stream Rehabilitation
Post-Bid
Charlotte, NC

Charlotte Readiness Center Erosion Remediation Project Package 1B
Post-Bid
Charlotte, NC 28208

Southpark Enhanced Crosswalks - Phase 1
Results
Less than $761,000 est. value
Charlotte, NC

McDowell Creek Greenway Project Phase 1A
Results
$1,600,000 to $1,700,000 est. value
Charlotte, NC

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Tattersall Storm Drainage Improvement Project
Results
Less than $3,256,030 est. value
Charlotte, NC

Lower Little Sugar Creek Greenway Polk Historic Site to the Sugar Creek State Line
Post-Bid
Charlotte, NC

Ashley Road Sidewalk
Results
Less than $1,300,000 est. value
Charlotte, NC

Willow Pond Stream Restoration
Post-Bid
Cornelius, NC 28031

445 Whispering Pines Drive Storm Drainage Improvement Project
Results
Less than $1,640,000 est. value
Charlotte, NC

Gosnell Drive Culvert Replacement
Post-Bid
Charlotte, NC 28227

Joint Duct Bank Relocation
Results
$200,000 to $400,000 est. value
Charlotte, NC

Last Updated 04/01/2020 08:12 AM
Project Title

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street

Physical Address View project details and contacts
City, State (County) Pineville, NC 28134   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at 9704 Leitner Drive, Pineville NC. 28134. Scope of work includes 2.3 miles of asphalt or concrete trail, prefabricated boardwalk, bridges, associated clearing, drainage, and erosion control. Stream rehabilitation efforts includes spot improvements along the length of the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Shoreline Protection, Waterway Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents