Similar Projects
South Final Tanks - TEMP22098 - City of Grand Rapids
Infrastructure
Conception
$500,000 est. value
Grand Rapids, MI 49503

5564-Eleanor Plainfield to Emerald - Water Improvement - TEMP20129 - City of Grand Rapids
Infrastructure
Conception
$1,550,000 est. value
Grand Rapids, MI 49505

Reconstruction of and Water Main in the Ottawa Avenue/Coldbrook Street/Monroe Avenue Intersection (Decommissioning of Coldbrook Pumping Station)
Alteration
Bidding
$2,959,380 est. value
Grand Rapids, MI

2022-2024 DWRF Lead Service Line Replacement (LSLR) (Watermain Replacement DWRF Loan)
Infrastructure
Bidding
$200,000 est. value
Hamtramck, MI

Replacement of Steam Manhole 81
Post-Bid
Lansing, MI 48937

DWRF Water Service Replacement Project
Post-Bid
McBain, MI 49657

Hangar 665 Expansion and Watermain Upgrades Project
Addition - 22,000 SF
Results
Less than $10,000,000 est. value
Gwinn, MI

Lead Service Line Replacement and Service Line Materials Verification Program
Results
Ferndale, MI

7170 - Grandville - Stolpe to Hall - Water Replacement - TEMP22064 - City of Grand Rapids
Infrastructure
Conception
$600,000 est. value
Grand Rapids, MI 49503

Water Main and Water Service Replacement
Infrastructure
Bidding
$927,792 est. value
Grand Rapids, MI

Water Meter Installation
Term Contract
Post-Bid
Detroit, MI

2021 Water Main Replacement and Road Reconstruction Program
Results
Bloomfield Hills, MI 48304

8372 - Cascade Burger Plat PFAS Project (Oak Tree, Maplecrest) - TEMP22061 - City of Grand Rapids
Infrastructure
Conception
$2,300,000 est. value
Grand Rapids, MI 49503

Howell's Walled Lake Subdivision Water Main and Road Improvements
Infrastructure
Bidding
$400,000 est. value
Novi, MI 48375

Gerstacker - Feed-Water System Replacement
Post-Bid
Ann Arbor, MI 48109

Last Updated 07/19/2022 01:42 AM
Project Title

Lead Service Line Replacements, Contract 4

Physical Address View project details and contacts
City, State (County) Muskegon Heights, MI   (Muskegon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,350,095
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Muskegon Heights, Michigan. Completed plans call for site work for a water / sewer project. The project consists of furnishing all material and constructing the following approximate quantities: Replacement of approximately 280 water services from the water main to inside the home or building Including all necessary appurtenances and restoration. Deposit: 5% of bid amount The Prime Contractor is hereby notified that their bidding on this project must follow, document, and maintain documentation of their Good Faith Efforts to ensure that DBEs have the opportunity to participate in the project by increasing DBE awareness of procurement efforts and outreach. Posting solicitations for quotes/proposals from DBEs on the Michigan Infrastructure and Transportation Association (MITA) website in accordance with conditions detailed in Exhibit The work to be performed under this contract will be financed and paid for by funds received from by the Michigan Department of Environment, Great Lakes, and Energy (EGLE) Drinking Water Revolving Fund (DWRF) and with City of Muskegon Heights local funds. DWRF monies will be received by the City of Muskegon Heights. Davis-Bacon/Prevailing Federal Wages apply to this project. Federal Labor Standards Provisions and associated documents that are incorporated in this contract are included in Appendix A. The DWRF Project Number is 7575-01. The Contractor also will be required to comply with the debarment and American Iron and Steel contractual language included in Appendix A. A bid bond, certified check, or cashier's check payable to City of Muskegon Heights in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of one hundred twenty (120) days after the receipt of bids. All work shall be substantially completed on September 2, 2024. Final restoration and project completion shall occur on or before September 17, 2024. Davis-Bacon/Prevailing Federal Wages

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents