Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

2022 Lake Whatcom Boulevard Sewer CIPP Project
Infrastructure
Bidding
$90,000 to $100,000 est. value
Bellingham, WA 98229

Rehabilitate Wastewater System
Alteration
Bidding
Port Angeles, WA 98363

Value Planning Analysis Services - The City of Palouse
Term Contract, Alteration
Post-Bid
Palouse, WA

Allen Road Sanitary Sewer Improvements
Infrastructure
Post-Bid
$225,000 est. value
Roy, WA 98580

Southside Interceptor CIPP Sewer Rehabilitation Phase 2
Infrastructure
Results
$1,662,108 est. value
Vancouver, WA 98687

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Bangor Keyport Force Main Replacement
Renovation, Infrastructure
Bidding
$23,200,000 to $24,700,000 est. value
Poulsbo, WA 98370

Highlands and Northwest Interceptor Sewer Rehabilitation
Infrastructure
Post-Bid
$1,206,033 est. value
Kennewick, WA 99336

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Pinebrook Force Main Re-Route
Infrastructure
Bidding
$360,000 est. value
Vancouver, WA

Continuous Steel Sewer Rod - Value Blanket
Infrastructure, Alteration
Post-Bid
Spokane, WA

Mercer Island and Enatai Interceptor Upgrade-Conveyance Improvements
Infrastructure
Results
$52,417,000 est. value
WA

45th Ave NE Sewer Re-Route (2022)
Infrastructure
Bidding
$400,000 est. value
Seattle, WA 98124

Catch Basin and Drywell Cleaning
Infrastructure, Alteration
Post-Bid
WA

Last Updated 03/08/2022 04:22 PM
Project Title

2022 Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Bremerton, WA   (Kitsap County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be completed includes rehabilitating approximately 8,000 lineal feet of sanitary sewer pipe using the cure-in-place pipe (CIPP) method, reinstating approximately 140 side sewers and removing 4 protruding laterals. The work to be completed includes rehabilitating approximately 1,300 lineal feet of storm sewer pipe using the cure-in-place pipe (CIPP) method, reinstating approximately 22 side sewers and removing 5 protruding laterals. The Work for both schedules also includes installing flow diversion and temporary bypass pumping, temporary traffic control, and all other work as identified in the Contract Documents. A portion of the work must be performed at night since the project route is along a principal arterial.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents