Similar Projects
Last Updated | 03/08/2022 04:22 PM |
Project Title | 2022 Sewer Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Bremerton, WA (Kitsap County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work to be completed includes rehabilitating approximately 8,000 lineal feet of sanitary sewer pipe using the cure-in-place pipe (CIPP) method, reinstating approximately 140 side sewers and removing 4 protruding laterals. The work to be completed includes rehabilitating approximately 1,300 lineal feet of storm sewer pipe using the cure-in-place pipe (CIPP) method, reinstating approximately 22 side sewers and removing 5 protruding laterals. The Work for both schedules also includes installing flow diversion and temporary bypass pumping, temporary traffic control, and all other work as identified in the Contract Documents. A portion of the work must be performed at night since the project route is along a principal arterial. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |