Similar Projects
Replacement of Community Building Boiler
Alteration
Bidding
East Haven, VT 05837

Renovations of HVAC in Dormitory Buildings
Post-Bid
$1,000,000 to $5,000,000 est. value
Vergennes, VT 05491

Heating Contractors for Weatherization Assistance Program
Post-Bid

Unit Vent Replacement - Rutland Town School
Results
Rutland, VT 05701

Wastewater Treatment Facility Digester Boiler Replacement
Results
Barre, VT 05641

Wright Hall Chiller Replacement
Post-Bid
Burlington, VT 05401

Town Buildings HVAC
Term Contract
Results
Colchester, VT

2020 Pellet Boiler Miller's Run Elementary School
Post-Bid
Sheffield, VT 05866

Police Department Ventilation System
Results
White River Junction, VT 05001

Bugbee Senior Center Heat Pump System
Post-Bid
White River Junction, VT 05001

Hinesburg Community School Kitchen Ventilation Upgrade
Results
Hinesburg, VT 05461

Hartford Police Department Heat Pump System
Post-Bid
White River Junction, VT 05001

Inline Fan Install, Saint Albans Federal Building, Saint Albans, Vt
Results
Saint Albans, VT 05478

Plumbing and HVAC Supplies
Post-Bid

Hinesburg Community School 2nd Floor Dehumidification
Results
Hinesburg, VT 05461

Last Updated 06/03/2021 09:05 AM
Project Title

North Troy Air Handling Unit

Physical Address View project details and contacts
City, State (County) North Troy, VT   (Orleans County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A project has been developed to modify an existing HVAC system to make the system more efficient and easier to maintain. The work involves removing multiple condensing and fan coil units and replacing them with one centralized air handling unit and one larger condensing unit. The work also involves installing a smaller split system that is dedicated to high traffic areas. The existing boilers and hydronic components will remain. Major reconfiguration of some existing ductwork will be required and the system will need to be integrated into the existing building automation system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents