Similar Projects
Demolition of Property at 515 Paxton
Demolition
Post-Bid
Calumet City, IL 60409

Demolition of Three Residential Structures
Demolition
Post-Bid
Park Forest, IL 60466

East Avenue Building Demolition
Demolition
Results
Less than $30,000 est. value
Hodgkins, IL 60525

2020 District Wide Demolitions Phase II at St. James Farm
Demolition
Results
Wheaton, IL 60189

Demolition of Properties
Post-Bid
Calumet City, IL 60409

Demolition, Hardscape and Landscape Improvements
Demolition
Results
South Holland, IL 60473

Demolition Five Single Family Homes
Demolition
Post-Bid
Waukegan, IL

Demolition
Results
Champaign, IL 61820

Building Demolition
Demolition
Post-Bid
Evergreen Park, IL 60805

Pullman State Historic Site Development
Renovation
Results
Less than $1,500,000 est. value
Chicago, IL 60628

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Demolition of 2 Houses and Five Buildings on 3 Parcels and Debris Removal From 2 Parcels Along the Proposed US 67 Corridor
Demolition
Results
IL

Demolition
Results
Alton, IL 62002

Demolition
Results
Alton, IL 62002

Building Foundation & Parking Lot Demolition
Demolition
Results
Carbondale, IL 62901

Last Updated 07/30/2020 10:26 AM
Project Title

Bilter Road Single Family Residence Demolition

Physical Address View project details and contacts
City, State (County) Aurora, IL 60507   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish nine single family residences (SFR) on Bilter Road: 1951, 1971, 1981, 1995, 2025, 2055, 2091, 2115, and 2145 Bilter Road Majority of these structures are 1 to 2 stories and wood framed. Demolition and haul off of all building materials above ground. Additionally, any portion of a building which extends more than one foot below grade shall be cut off and left in place as follows: basement walls shall be cut off and removed to minimum depth of one foot below grade, all items within basement shall be removed and disposed of, leaving only the walls (below one foot), footings and floor slab, basement slabs shall be intermittently broken to allow any water which may accumulate to drain out of the bottom, no backfilling of basements will be required, as this will be performed by the City immediately after demolition is completed and contractor has demobilized. Barn located at 1951, set back approximately 400 feet south of Bilter Road shall remain.

Details

Division 02 - Existing Conditions, Demolition, Selective Site Demolition, Paving Removal, Structure Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents