Similar Projects
Gold Coast Library
New Construction - 10,991 SF
Design
$11,300,000 est. value
Glen Head, NY

Greenporter Hotel Expansion Phase 2
Renovation, Addition, Alteration
Design
$5,000,000 est. value
Greenport, NY 11944

Addition & Renovations to the Fiber Mill For the Stillwater Public Library Stillwater - Contract No. 2 - General Construction Work
Addition, Demolition, Renovation, Infrastructure
Bidding
$4,400,000 CJ est. value
Stillwater, NY 12170

Restroom Improvements Implementation for the Frank J. Basloe Library
Renovation
Bidding
$100,000 CJ est. value
Herkimer, NY 13350

Pawling Free Library ADA Lavatories and Fuel Tank Replacement
Addition, Infrastructure
Post-Bid
Pawling, NY 12564

Southern Tier Library System Office Renovation
Renovation
Post-Bid
Painted Post, NY 14870

Elevator Addition at North Castle Public Library
Addition
Results
Armonk, NY 10504

Salamanca Public Library
Renovation
Results
Salamanca, NY 14779

Crane Branch Library Reconstruction Phase 1
Renovation
Construction
Buffalo, NY 14202

Audubon Library Expansion Phase I and II
Addition
Construction
Buffalo, NY 14228

Pace University Academic Center & Dormitory
New Construction - 213,084 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY

RFP Design - Guernsey Memorial Library Floor Plan Renovation
Renovation
Pending Verification
$200,000 CJ est. value
Norwich, NY 13815

Tabernacle of Praise Cathedral
New Construction, Infrastructure - 38,000 SF
Design
$12,000,000 CJ est. value
Brooklyn, NY 11203

Public Improvements at Isaias Gonzalez-Soto Library Restoration - Phase 1
Renovation
Post-Bid
Buffalo, NY 14201

Scotia Branch Library Addition
Addition
Results
Scotia, NY 12302

Last Updated 10/05/2022 12:03 PM
Project Title

2021-2022 Capital Improvement Program - Rockville Centre Public Library - Contract 1 - General Construction

Physical Address View project details and contacts
City, State (County) Rockville Centre, NY 11570   (Nassau County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $515,000 [brand] Estimate
Plans Available from Copy Center - 09/19/22
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall be as follows: CONTRACT #1- GENERAL CONSTRUCTION SED # 28-02-21-03-6-022-010- ROCKVILLE CENTRE PUBLIC LIBRARY Checks for deposits shall be made payable to the ROCKVILLE CENTRE PUBLIC LIBRARY. All bid addenda will be transmitted to registered plan holders via email and will be available at the above referenced websites. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Plan holders who have obtained hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued There will be no charge for registered plan holders to obtain hard copies of the bid addenda. The bid deposit shall be refunded to each Bidder only if the plans and specifications are returned, in good condition, with no handwritten notations thereon within (30) calendar days after the bid opening date. All deposits shall be forfeited to the LIBRARY after the (30) days have elapsed. ANY PERSON OR CORPORATION WHO FAILS TO SUBMIT A BID SHALL FORFEIT THEIR HARD COPY PLAN DEPOSIT IN ITS ENTIRETY. Each Bidder must deposit, with their sealed bid, security in an amount not less than 10% of the base bid and all Alternate Bids in the proper form subject to the conditions set forth in the Instructions to Bidders (Page 3). Attention of the Bidders is specifically directed to the minimum wage rates to be paid under the contract, as well as to other provisions set forth in the bidding documents. Bidder will also be required to show, to the satisfaction of the ROCKVILLE CENTRE PUBLIC LIBRARY that they are carrying Workers' Compensation Insurance as required by law and all other Insurance in amounts not less than that specified under the General Conditions. Performance Bonds and Labor/Material Bonds, as called for in the General Conditions are a requirement of each contract. The ROCKVILLE CENTRE PUBLIC LIBRARY reserves the right to reject any or all bids submitted, to waive any informality or irregularity in any bid, and/ or to accept any bid in whole or in part and/ or to award or not award the contract, if in the opinion of the ROCKVILLE CENTRE PUBLIC LIBRARY, the best interest of the LIBRARY will thereby be served. This invitation is an offer to receive bids for a contract. The successful Bidder will be required to execute a formal contract in the form contained in the Contract Documents. All bids received after the time stated in the Notice to Bidders will not be considered and will be returned unopened to the bidder. The bidder assumes the risk of any delay in the mail or in the handling of the mail by employees of the LIBRARY. Whether sent by mail or by means of personal delivery, the bidder assumes responsibility for having its bid deposited on time at the place specified. Each Bidder shall agree to hold their bid price for (45) days after the formal bid opening every contractor and sub-contractor shall submit to the LIBRARY within (30) days after issuance of its first payroll, and every (30) days thereafter, a transcript of the original payroll record, as provided by this article, subscribed and affirmed as true under penalties of perjury. The LIBRARY shall be required to receive and maintain such payroll records. The original payrolls or transcripts shall be preserved for (5) years from the completion of the work on the project

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents