Similar Projects
Brentwood Various Streets and Roads Preservation - 336-31694- City of Brentwood
Infrastructure
Conception
$750,000 est. value
Brentwood, CA 90049

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Construction Manager - 2022 Annual Paving Project and Moraga Way Pedestrian Pathway
Infrastructure
Bidding
$2,660,000 est. value
Orinda, CA

Seal and Pave Roads, Delta Field Division, O and M Center, Contra Costa and Alameda Counties
Infrastructure
Bidding
$5,000,000 to $5,750,000 est. value
Byron, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Crow Canyon Road Widening Project
Infrastructure
Results
$10,400,000 est. value
San Ramon, CA 94583

First Street Rain Garden
Infrastructure
Bidding
$450,000 est. value
Lafayette, CA 94549

2022 Pavement Maintenance
Infrastructure
Post-Bid
$400,000 est. value
Diablo, CA

Byron Highway at Byer Road Safety Improvements
Infrastructure
Results
$1,229,000 est. value
Martinez, CA

Sycamore Avenue Pavement Rehabilitation Project
Infrastructure
Bidding
$1,500,000 est. value
Hercules, CA 94547

2022 Slurry Seal
Infrastructure
Post-Bid
$575,000 est. value
Walnut Creek, CA 94598

Pavement Management Program 2022 (Concrete Repairs)
Infrastructure
Results
$222,000 est. value
Brentwood, CA

Morada Area Streets Resurfacing
Infrastructure
Bidding
$2,000,000 est. value
Brisbane, Cupertino, Los Gatos, Morada, Orinda, Salida, San Anselmo, Stockton, CA 95212

Last Updated 06/23/2022 02:55 PM
Project Title

Brentwood Boulevard Widening North - Phase 1 - 336-31620

Physical Address View project details and contacts
City, State (County) Brentwood, CA 94513   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $7,050,340
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving, outdoor lighting and new construction of a mixed-use development in Brentwood, California. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. This project will continue the widening of Brentwood Boulevard (120' right-of-way) with two lanes in each direction (approximately 1,400') and will include: two bike lanes; curbs; gutters; medians; sidewalk on east side; street lights and landscaping on each side of the roadway. This project will also include a new parallel bridge over Marsh Creek, traffic signal modification at Brentwood Boulevard and Grant Street and moving the overhead power lines, telephone lines and cable lines underground. This project will improve safety, traffic flow and facilitate adjacent development. Brentwood Boulevard Widening North is broken up into three phases. Phase 1 is from Havenwood Avenue to Homecoming Way, including a new parallel bridge over Marsh Creek. This project is included in the City of Brentwood's FY 2021/2022-2025/2026 Capital Improvement Program (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents