Similar Projects
Sidewalk Improvements for Safe Routes to School
Infrastructure
Design
Argenta, IL

Sanitary District of Decatur Front Gate, Fence and Road Repairs
Infrastructure, Renovation
Bidding
$376,000 CJ est. value
Decatur, IL 62522

Sanitary District of Decatur Front Gate, Fence and Road Repairs
Infrastructure, Renovation
Bidding
$376,000 CJ est. value
Decatur, IL 62522

2021 Faries Park Roadway
Alteration
Post-Bid
Decatur, IL 62526

Bus Barn Pavement
Infrastructure
Post-Bid
Argenta, IL 62501

Milling and resurfacing at 3 locations: 1) US 51 at IL 48; 2) I-72 at SN 058-0063/64; 3) US 51, 2 miles south of Maroa
Results
Maroa, IL

Bituminous Materials
Results
Macon, IL

Veterans Pond Spillway Repairs
Infrastructure
Bidding
$112,000 CJ est. value
Forsyth, IL 62535

Asphalt Pad Sinawik Bid
Infrastructure
Post-Bid
Decatur, IL 62521

Montessori Academy for Peace Site Work
Alteration
Results
$236,275 to $380,888 est. value
Decatur, IL 62521

2021 Greenwood Cemetery Road Resurfacing
Infrastructure
Post-Bid
Decatur, IL 62522

0.7 Miles of Patching, Milling, HMA Resurfacing and Longitudinal Joint Sealant
Infrastructure
Results
Decatur, IL

Sidewalk Removal, New PCC Sidewalks, Pipe Culverts, Pavement Markings at Various Locations in Warrensburg
Infrastructure
Post-Bid
$2,000,000 est. value
IL

18.7 Miles of Patching and a-2 Surface Treatment on Various Routes in Clay
Infrastructure
Results

Various City, County, Township, and Village Streets
Infrastructure
Post-Bid
$198,000 est. value
Decatur, IL

Last Updated 09/23/2022 03:07 PM
Project Title

A-O Grade School Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Oreana, IL 62554   (Macon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction Nearing Completion, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $333,852 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project has only one bidder Christy-Foltz Inc. for $333,852.00. The start date was 8/8/2022 and it will be completed on 9/30/2022. The project consists of pavement and sidewalk removal, reshaping subgrade material to meet the lines and grades and placement of concrete sidewalk and concrete pavement. There will be one add alternate for the project, removal of concrete stoops, top soil removal, reshaping of subgrade material and placement of concrete sidewalk. "A. If awarded the contract for the work of this Proposal, I/We agree to begin construction upon receipt of written Notice to Proceed from A-O CUSD #1 and agree that phase 1, as shown on the attached drawing titled "A-O Grade School Pavement Phase Plan", work shall be substantially complete on Friday, August 12, 2022. Phase 2 will be completed at an agreed upon date between the Owner and the Contractor Fax or email questions to Engineer. Telephone (voice) queries are discouraged. 1. Fax: Stephen Jacobs at 217-877-4816 2. Email: stephen.jacobs@sksengineers.com 3. Use the following subject line: "A-O Grade School Pavement Bid Question

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents