Similar Projects
Spruce Place
New Construction - 27,122 SF
Design
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Design
$70,000 est. value
Waitsfield, VT

Material Spreaders
Post-Bid
Montpelier, VT

Retainer Contracts for Electrical Services Within Districts 1-4
Term Contract
Post-Bid
Less than $150,000 est. value
Montpelier, VT

Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP)
Results

Monitor Well Drilling at Lake Carmi
Term Contract
Results
Montpelier, VT 05620

Yestermorrow Design/Build School
New Construction, Demolition
Construction
Waitsfield, VT 05673

Vermont Creamery Phase 2
New Construction, Addition, Demolition - 5,450 SF
Construction
$2,363,645 est. value
Websterville, VT 05678

J--Electrical Services BOA
Post-Bid

Compact-Crane Lift System
Results

Track Mounted Hydraulic Excavator Reduced Tail Swing Design
Post-Bid
Montpelier, VT 05633

Washington County Courthouse Lighting Controls Upgrade
Results
$350,000 est. value
Barre, VT 05641

Track Mounted Hydraulic Excavator Standard Tail Swing Design
Post-Bid
Montpelier, VT 05633

Hoist Inspections and Repair at Waterbury Dam
Term Contract
Results
Less than $11,000 est. value
Waterbury, VT 05620

John Deere Riding Mower X590
Post-Bid
Montpelier, VT 05633

Reported 09/11/2019 12:00 AM
Project Title

Sugarbush Mt. Ellen EVSE Installation

Physical Address View project details and contacts
City, State (County) Warren, VT   (Washington County)
Category(s) Heavy and Highway, Single Trades, Transportation
Sub-Category(s) Electric, Equipment, Misc. Structures, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description This project entails installing nine level-two charging stations at nine publicly accessible EV parking spaces. The Contractor shall provide all the electrical, Clipper Creek HCS-40R (or equivalent) EV Chargers, wiring, conduit, and trenching associated with eight non-networked L2 plugs including a step down transformer, usage meter, and service entrance pedestal for the parking lot units. And one Clipper Creek HCS-40R (or equivalent) EV Charger, wiring, conduit, and associated equipment for the building mounted ADA accessible charger with one non-networked L2 plug.
Details Site Development, New Construction.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents