Similar Projects
Silver Line Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$57,992,500 CJ est. value
Fairfax, VA 22030

Oakton Fire Station - Fairfax County
New Construction, Infrastructure
Conception
$18,000,000 CJ est. value
Fairfax, VA 22030

Fairfax Presbyterian Church Affordable Housing Development
New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Fairfax, VA 22030

City Center West
New Construction, Infrastructure - 32,022 SF
Design
$140,000,000 CJ est. value
Fairfax, VA 22030

University Drive Outfall Relocation
Infrastructure
Bidding
$300,000 CJ est. value
Fairfax, VA 22030

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Route 29 Road Widening - Virginia Department of Transportation
Renovation
Construction
$81,800,000 CJ est. value
Fairfax, VA 22030

Flagship Carwash Facade Renovations
Infrastructure, Renovation
Construction
$700,000 CJ est. value
Fairfax, VA 22030

Fairfield at Gateway
Demolition, New Construction, Infrastructure - 33,000 SF
Pending Verification
$40,000,000 CJ est. value
Fairfax, VA 22030

Fairfield at Gateway
Demolition, New Construction, Infrastructure - 33,000 SF
Pending Verification
$40,000,000 CJ est. value
Fairfax, VA 22030

Community Center Courts Renovations - Fairfax County
Renovation, Infrastructure
Conception
$2,800,000 CJ est. value
Fairfax, VA 22030

Popeyes Restaurant / Fairfax
New Construction, Infrastructure - 2,275 SF
Design
$700,000 CJ est. value
Fairfax, VA 22030

Last Updated 09/30/2023 06:33 AM
Project Title

Construction, Farr Avenue Extension (Northfax West)

Physical Address View project details and contacts
City, State (County) Fairfax, VA 22030   (Fairfax City County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an extension of Farr Avenue, creating a new north-south roadway between Fairfax Boulevard and Orchard Street. Questions Deadline September 26, 2023 A fully completed and properly executed original Bid Bond, cashier's check, certified check, money order, or cash escrow in the amount of five percent (5%) of the amount of the bid made payable to the Treasurer of the City shall accompany each bid. The project scope includes, but is not limited to the following Work as specified in the City of Fairfax Public Facilities Manual and/or VDOT Standards/Specifications as applicable: o Earthwork and grading o Road construction, including associated curb & gutter and parking bump-outs o Pedestrian accommodations including sidewalk and curb ramps o Storm drainage and stormwater management improvements o Streetlights (acorn style), including associated conduit & electrical work o Permanent pavement markings & signing o Landscaping and beautification o All measures required for erosion & sediment control and maintenance of traffic o Materials testing in accordance with the current VDOT Inspection Manual o Other items necessary for completion of the work per contract documents The construction plans for this project depict work performed between Fairfax Boulevard and the realigned leg of Orchard Street. However, only a portion of this work is included within the scope of thisIFB. Farr Avenue Extension work shall only be performed on Parcel 003 (C/L Sta. 15+04.17 to C/L Sta. 18+68.36. Work depicted south of this property boundary (including Parcel 001 and work within Fairfax Boulevard ROW) is to be performed by others and is explicitly excluded from this IFB. Work described within this IFB is also inclusive of road work to construct the intersection with Farr Avenue Extension and Northfax Street, formerly and referred to in the plans as Orchard Street. Work on Northfax Street shall be performed between C/L Sta. 600+00.00 and C/L Sta. 600+38.02.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents