Similar Projects
Southwest Lift Station Construction
Renovation
Bidding
Provo, UT

1500 East Force Main Improvements Project
Renovation
Bidding
Vernal, UT

Autoliv AOA Pump House Addition
Addition - 425 SF
Post-Bid
Ogden, UT 84401

2019 Payson City Spring Lake Pump House Modifications
Post-Bid
Payson, UT 84651

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

Virgin River Pumphouse Renovation
Renovation
Results
$200,000 to $500,000 est. value
Saint George, UT

Construction of the Walmart Lift Station
Post-Bid
Richfield, UT

Sewer Lift Station Grinders
Results
Roy, UT 84067

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Elk Ridge Oak Lane Booster Pump Station
Results
Less than $500,000 est. value
Elk Ridge, UT 84651

Concrete Lined Pond and Pump Station
Post-Bid
Highland, UT 84003

Last Updated 11/07/2019 10:11 AM
Project Title

Eaglewood Pump Station - NSL Project

Physical Address View project details and contacts
City, State (County) North Salt Lake, UT 84054   (Davis County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the construction of the above described project as included in the Contract Documents; consisting of the following items of work: Construction of masonry pump building, including all earthwork, all pipe work, pumps, site preparation and grading, asphalt, and all appurtenant work (all electrical work is excluded from the Contract and is to be done by City).

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents