Similar Projects
Timber Bluffs Acres Phase I and II
New Construction
Conception
Eau Claire, WI 54701

C Rice Lake, Hammond Avenue Const / Misc / Culvert Replacement
Renovation, Infrastructure
Conception
$750,000 to $1,000,000 est. value
Cumberland, WI 54829

Hamilton Public Works and Hall
Infrastructure - 18,762 SF
Design
$4,845,000 CJ est. value
West Salem, WI 54669

Hamilton Public Works and Hall
Infrastructure - 18,762 SF
Design
$4,845,000 CJ est. value
West Salem, WI 54669

O.B. Sherry Park - 3457/3461/3465 Milwaukee Street Demolition and Site Restoration
Demolition, Infrastructure
Bidding
$30,000 est. value
Madison, WI 53714

RFP Design - Modernization - WASF facility
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Milwaukee, WI 53204

Spring Harbor Dredging 2022
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Madison, WI 53715

Public Construction Phase 4 Street Lighting at Westlawn Gardens Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Milwaukee, WI 53218

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

2021 Watermain Replacement
Results
Glendale, WI

Omro Road Utility Relocation
Renovation
Results
Algoma, WI

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

STH 133, Cassville - Patch Grove, 400 ft S CTH VV to STH 35, Grant
Infrastructure
Pending Verification
$9,000,000 CJ est. value
Mount Hope, WI 53816

The Opportunity Center
New Construction, Infrastructure - 300,000 SF
Pending Verification
$80,000,000 CJ est. value
Milwaukee, WI 53209

Last Updated 08/02/2022 12:02 PM
Project Title

Fair Street Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Mineral Point, WI 53565   (Iowa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer - 07/25/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of installation of new prefabricated fiberglass duplex grinder lift station and associated force main. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. Bidding Documents: The Issuing Office for the Bidding Documents is: Delta 3 Engineering, 875 S. Chestnut Street, Platteville, WI 53818, (608) 348-5355, mail@delta3eng.biz Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Consideration of Bids: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check, bank money order, or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Ms. Jamie Marcue, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except that additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. A pre-bid conference will not be conducted, and bidders will not need to be prequalified. Additional Conditions: The letting of the work described herein is subject to the provisions of Sections 62.15, 66.0901, and 66.0903(1m) of the Wisconsin Statutes. There are no prevailing wage rates for this Project. The City of Mineral Point encourages Minority-owned Business Enterprises (MBE's), Women's Business Enterprises (WBE's), Disadvantaged Business Enterprises (DBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of participation for MBE/WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. Written inquiries shall be mailed or hand delivered to Mark Digman, P.E., Delta 3 Engineering, Inc., 875 S. Chestnut Street, Platteville, Wisconsin, 53818. B. Electronic inquiries shall be emailed to the following email address: markdigman@delta3eng.biz with the subject line "Fair Street Lift Station Replacement".

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents