Similar Projects
Well 3 and One for Well 4
Bidding
$28,000 est. value
Sandwich, MA

Two Irrigation Wells at 115 Cochituate Road and 317 Hollis Street
Bidding
Framingham, MA 01701

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids
Renovation
Sub-Bidding
$8,400,000 est. value
Medfield, MA 02052

Redevelopment of Municipal Drinking Water Supply Wells
Post-Bid
Less than $20,000 est. value
North Reading, MA

Two Torque Flow Pumps
Post-Bid
Boston, MA 02129

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Install 2 Gravel Packed Wells
Results
Less than $230,000 est. value
Fairhaven, MA

Plympton Street and East Main Street No. 2 Well Cleaning and Pump Rehabilitation
Bidding
$75,000 est. value
Middleborough, MA

Well Inspection/Maintenance and Repairs
Post-Bid
Less than $50,000 est. value
Edgartown, MA 02539

Installation of Landfill Gas Extraction Wells at the Crapo Hill Sanitary Landfill
Results
Less than $41,580 est. value
New Bedford, MA

Peirce and Mann Halls Fire Pump, MSCBA Project - General Bids
Bidding
$125,000 est. value
Boston, MA

Narrows Road Facility Hydrogenerator and Marshall Regulating Plant Pumps - General Bid
Post-Bid
Fitchburg, MA 01420

One Displacement Rotary Pump Bare Mode
Results
Boston, MA 02129

Wells 3 and 4 Water Treatment Plant - General Bids
Bidding
$8,400,000 est. value
Medfield, MA 02052

2020 Cleaning and Redeveloping of Kane and Chestnut Well 2
Post-Bid
Hudson, MA 01749

Last Updated 09/21/2020 07:51 AM
Project Title

Construction of Two Gravel-Packed Wells for Municipal Water Supply, and Decommissioning of Four Municipal Wells

Physical Address View project details and contacts
City, State (County) South Dartmouth, MA 02748   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $475,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Include the construction of two (2) 18- x 24-inch diameter gravel-packed wells and the decommissioning of four (4) gravel-packed wells. The Work will be completed in two phases. Phase 1 will consist of the construction of the two (2) gravel-packed wells and the decommissioning of three (3) inactive wells, to be substantially completed within 150 days of commencement of Phase 1. Phase 2 will consist of the decommissioning of one active well (V-1)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents