Similar Projects
Pavement Markings Highway:SH0099
Bidding
$446,083 est. value
TX

IH0069-Raised Pavement Markers
Bidding
$264,576 est. value
TX

Wall Signs and Installation
Post-Bid
Houston, TX 77009

Landscaping Bollards
Post-Bid
Houston, TX 77004

Fabricate and Deliver Various Signs and Related Items
Term Contract
Results
Less than $190,000 est. value
Houston, TX

Terminal C and Garage Wayfinding Signage Project at George West Bush Intercontinental Airport (IAH)
Results
Less than $4,000,000 est. value
Humble, TX 77338

International District Thematic Signage
Bidding
$250,000 est. value
TX

Marquee Signs
Post-Bid
Houston, TX 77002

Install Pavement Markings
Results
Less than $403,964 est. value
TX

Clayton Library Signage
Post-Bid
Houston, TX 77004

Mill and Overlay on Existing SH 99 Mainlanes/Ramps and Replacement of Pavement Markings
Results
Less than $988,125 est. value
Houston, TX 77000

Parking Signs and Installation
Post-Bid
Houston, TX 77002

Miscellaneous Work Sound Wall Construction
Results
Less than $2,997,198 est. value
TX

Airfield Marking Paint
Post-Bid
Houston, TX 77251

Reflective Pavement Markings (Graphics)
Results
Less than $1,719,891 est. value
TX

Last Updated 02/26/2020 11:38 AM
Project Title

North Corridor Barrier Enhancement

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Metro North Corridor Barrier Transitions project includes the removal and replacement of crash cushion attenuators at 8 locations as follows: 1. Main Street at Hogan Street (southbound) 2. Fulton Street at King Street (northbound) 3. Fulton Street at Donlen Street (southbound) 4. Fulton Street at Stokes Street (northbound) 5. Bennington Turnaround (in median) 6. Fulton Street at Bennington (northbound) 7. Fulton Street at Dorchester (southbound) 8. Main Street at Providence/Rothwell (northbound) Six of the repair locations are within the HB&T bridge area (north of IH-610) and the other two locations are at the south end of the North Corridor. Other improvements include pavement markings (painted and raised) and new signs to improve the visibility of the vehicle lanes within the project limits.

Details

Division 34 - Transportation, Roadway Construction, Vehicle Barriers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents