Similar Projects
CON EHRM Infrastructure Upgrades - St John CBOC - New Orleans, LA
Term Contract
Design
$25,000 to $100,000 est. value
LA 70084

Generator - DPS
Alteration
Bidding
Baton Rouge, LA 70806

Electrical and Plumbing Repairs for LDWF
Alteration
Bidding
Marksville, LA 71351

H259--667-21-4-501-0386, Tri-Annual Switchgear Testing (Va-21-00048177)
Term Contract
Post-Bid
Shreveport, LA 71101

OCS Pole Replacement
Alteration
Post-Bid
New Orleans, LA

Electrical Upgrades at Pentagon Barracks, State Capitol Park
Alteration
Results
$240,112 est. value
Baton Rouge, LA

Duck Pond Aeration Fountains and Lighting
Alteration
Results
$50,000 est. value
Shreveport, LA

Combustion-Turbine Generator 7 Procurement
Alteration
Bidding
LA

Electrical Generator and Diesel Engine (Fire Pump)Maintenance Service
Alteration
Post-Bid
New Orleans, LA

Texas Street Bridge Lighting Installation
Alteration
Results
$750,000 est. value
Shreveport, LA

Installation of Gas Circuit Breaker and Control Panels Phase II
Alteration
Bidding
Vinton, LA

Lakefront Parking Garage - Phase II
New Construction, Alteration
Post-Bid
Lake Charles, LA

Electrical Upgrades Pentagon Barracks
Alteration
Results
Less than $240,112 est. value
Baton Rouge, LA

JPRD West Bank Office Generator Installation
Alteration
Bidding
Marrero, LA

2021 Purchase of Two, Four Way 600amp Switchgear
Alteration
Post-Bid
Lafayette, LA

Reported 02/09/2022 12:00 AM
Project Title

Underground Electrical Work for DOC

Physical Address View project details and contacts
City, State (County) Jackson, LA 70748   (East Feliciana County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and Replacement of Electrical Components for Dixon Correctional Institute, located at 5568 Highway 68, Jackson, LA 70748. Remove existing two hundred (200) amp MDP (Main Distribution Panel), and feeder coming from the transfer switch. Build new unistrut rack to support new four hundred (400) amp MDP (Rack will be built on site to support the Main Distribution Panel). Install new main breaker four hundred (400) amp MDP (Main Distribution Panel), with new 200A, 60A, 50A, 15A, 40A breakers. Breaker will need to be compatible with the Main Distribution Panel. Install new feeder to 400 amp MDP from transfer switch. Install new two hundred (200) amp panel with five (5), three (3) pole, thirty (30) amp breakers. Bore conduit, cut and thread ridged conduit into new two hundred (200) amp panel. Pull new two-hundred fifty (250) MCM (thousands of circular mils) THHN (thermoplastic high heat-resistant nylon) copper feeder wire, terminate, and test.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents