Similar Projects
Massasoit Estates
New Construction
Conception
Taunton, MA

Friend Street Subdivision
New Construction
Conception
Freetown, MA 02702

Bakerville Woods
New Construction
Design
Dartmouth, MA 02747

Caswell Street Subdivision
New Construction
Design
Taunton, MA

478-480 Union Street Homeownership Development
Bidding
New Bedford, MA

HILAPP Phase II - Roofing, Siding, Windows, Door and Porch Trim Replacement - General Bid
Bidding
Less than $3,489,000 est. value
New Bedford, MA 02740

HILAPP Phase II - Roofing, Siding, Windows, Door and Porch Trim Replacement - Filed Sub-bids
Sub-Bidding
Less than $3,489,000 est. value
New Bedford, MA 02740

ADA Reasonable Accommodation Roll-In Shower, Elm Terrace 667-2
Post-Bid
Less than $18,000 est. value
North Attleborough, MA

2020 On-Call Trades Contract
Post-Bid
Less than $25,000 est. value
Fall River, MA

2019 On-Call Trades Contract
Results
$25,000 est. value
Fall River, MA

Kitchen Upgrade
Results
Less than $34,600 est. value
Attleboro, MA 02703

Fuller Estates
New Construction
Construction
Taunton, MA 02780

Bella Rose Estates
New Construction
Pending Verification
Taunton, MA

Fisher Estates
New Construction
Design
Somerset, MA

Disposition of Municipal Property for the Development of Affordable Housing
Post-Bid
Westport, MA

Last Updated 07/24/2019 06:15 AM
Project Title

Kitchen & Flooring Renovations - Unit Vacancy Reduction 2, Maple Gardens 200-2 - Filed Sub-Bids Due

Physical Address View project details and contacts
City, State (County) Fall River, MA 02721   (Bristol County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $506,688
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, General Building Construction Consists of: Kitchen upgrades & associated electrical upgrades, asbestos abatement, floor finish replacement
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents