Similar Projects
Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Lido Key Hurricane Storm Damage Reduction Project Sarasota County, Florida
Post-Bid
$20,000,000 to $30,000,000 est. value
Sarasota, FL 34230

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Morgan's Glen Phases 1 and 2 (Site Civil) and Phase 3 (Earthwork)
Post-Bid
Sarasota, FL

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

Seawall Repair
Results
Everglades, FL

Portland Cement and General Contractor
Results
Less than $14,102,991 est. value
FL

Last Updated 02/05/2020 07:25 AM
Project Title

Construction Services in Connection with Improvements to Lewis Boulevard

Physical Address View project details and contacts
City, State (County) FL   (Hendry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the roadway and associated drainage improvements for Lewis Boulevard from Georgia Avenue to US27, in accordance with the plans that were prepared by AIM Engineering & Surveying, Inc. which may include, but are not limited to: • Surveying • Maintenance of traffic (MOT) incidental to the construction • Clearing and grubbing • Embankment, Excavation and grading • Milling and resurfacing of existing asphalt roadway • Edge of pavement base repairs and full pavement restoration • Testing • Installation of rubble riprap (if required) • Installation of drainage pipes, endwalls and gravity walls • Pipe/catch basin desilting • Utility coordination • Guardrail removal/installation • Installation of sod and other erosion control measures as required • Installation of pavement markings/rumble strips • Sign removal/installation • Secure necessary paperwork to access private property when needed • As-built survey

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents