Similar Projects
Wastewater Treatment Plant - Village of Marcellus
Renovation
Conception
$4,400,000 est. value
Marcellus, NY

East Genesee Street Commercial Development
New Construction, Infrastructure - 100,000 SF
Conception
$20,000,000 CJ est. value
Fayetteville, NY 13066

Construction Management Services
Renovation, Infrastructure
Design
$72,184,922 CJ est. value
Syracuse, NY 13207

Route 31 at Thompson Road and South Bay Rd Intersection IMP
Infrastructure
Design
$3,750,000 CJ est. value
Cicero, NY 13039

2022-2023 City Sidewalk Maintenance (Small Repairs)
Infrastructure
Bidding
$80,000 CJ est. value
Syracuse, NY 13202

Replacement of the Warners Road Bridge over I-90
Infrastructure
Bidding
$2,000,000 CJ est. value
Liverpool, NY 13088

Wastewater Treatment Plant Primary Clarifier Improvements
Renovation
Post-Bid
$600,000 est. value
Minoa, NY

Furnish Wetzel Road WWTP Digester 2 Rehabilitation as Specified
Renovation
Post-Bid
NY

Baldwinsville CSD Palmer Elementary Playground Site Preparation
Results
Baldwinsville, NY 13027

Baldwinsville-Seneca Knolls Wastewater Treatment Plant Asset Renewal Project - Phase I
Renovation
Results
Less than $11,200,000 est. value
Baldwinsville, NY 13027

Fietta Property Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Manlius, NY 13057

Bowman Road East Solar Array
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
East Syracuse, NY 13057

RFP Design - Design Consulting Services for Onondaga Creek Restoration
Infrastructure
Conception
$250,000 CJ est. value
Syracuse, NY 13202

Rt 31 Rehab, CNS High School to S. Bay Rd, Onon Co
Infrastructure
Design
$3,050,000 CJ est. value
Cicero, NY 13039

Playground Installation
Infrastructure
Bidding
$420,207 CJ est. value
Syracuse, NY 13202

Last Updated 09/30/2022 08:42 AM
Project Title

Bville Seneca-Knolls Grit Classifier Drain Line

Physical Address View project details and contacts
City, State (County) Baldwinsville, NY 13027   (Onondaga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide 12 inch schedule 40 PVC pipe and applicable fittings, hardware, gaskets, and solvents for Baldwinsville Seneca Knolls grit clarifier temporary drain line. Delivered.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents