Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Sanders Street Crosswalks & Bulbouts Construct - City of Chelan
Infrastructure
Conception
$700,000 CJ est. value
Chelan, WA 98816

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

SR 971/Navarre Coulee Site 5 - Rock Slope Scaling
Infrastructure
Design
$300,000 CJ est. value
Chelan, WA 98816

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

US 2, Stevens Pass East - Paving
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
Leavenworth, WA 98826

Rock Island Powerhouse 2 - Unit U5 Service Water Upgrade
Infrastructure
Results
$1,100,000 est. value
Wenatchee, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Construction
$234,432,000 CJ est. value
Kirkland, WA 98033

Regional Aquatic Center / Wenatchee Landing - City of Wenatchee
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Wenatchee, WA 98801

Microsoft Data Center / Malaga
New Construction, Infrastructure - 750,000 SF
Pending Verification
$160,000,000 CJ est. value
Malaga, WA 98828

Multi Use Trail - SR 150 Crystal Drive to Lakeside - City of Chelan
Infrastructure
Conception
$1,000,000 CJ est. value
Chelan, WA 98816

US 12/Ackley Rd/Clover Lane - Intersection Safety Improvements
Infrastructure
Design
$1,008,000 CJ est. value
Leavenworth, WA 98826

Re-Bid Pinnacles Prep Charter Public School PHASE 1.5A ALTERATIONS & ADDITION
Addition, Demolition, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Wenatchee, WA 98801

Last Updated 10/17/2023 07:36 AM
Project Title

AC Water Main Replacement Projects

Physical Address View project details and contacts
City, State (County) Wenatchee, WA 98801   (Chelan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

AC Water Main Replacement Projects Site Directions: Multiple roadway locations throughout Wenatchee Installation of new water mains and abandonment of existing Asbestos Cement water mains. Existing water lines and services will be replaced in 1st Street from Wilson to Miller and in Chelan Ave. from Marr to Lincoln. A new water main will be constructed in 8th Street between Miller and Wilson including new hydrants and services. Roadways will be repaved and ADA compliant pedestrian ramps will be built in accordance with the plans and specifications. The project cost is estimated between $1,100,000, and $1,300,000. Work to be performed includes: Installation of approximately 375 feet of 6-inch ductile iron water mains, approximately 1,650 feet of 8-inch ductile iron water mains, replacement or reconnection of 11 customer water services, installation of 28 water services, removal and disposal of 320 feet of 6-inch asbestos-cement pipe, grout filling in-place of 400 feet of 8-inch asbestos cement pipe and 220 feet of 6-inch steel pipe; installation of 9 ADA sidewalk ramps, installation of 5 catch basins, and grinding and overlaying the work areas. Work on existing asbestos-cement pipe will require personnel with proper certifications. PROJECT LOCATION There are three locations on this project: o First Street from North Miller Street to North Wilson Street. o Intersection of South Chelan Avenue and Marr Street. o 8th Street from Ramona Avenue to North Miller Street. Questions regarding the project should be addressed to: Jeremy Hoover, PE City of Wenatchee Phone: (509) 888-3212 Email: jhoover@wenatcheewa.gov Each request for such interpretation should be by email or in writing addressed to City of Wenatchee, 301 Yakima Street, Wenatchee, Washington 98807.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents