Similar Projects
The Maintenance Team Building
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28217

Centene East Coast Headquarters Phase 3
New Construction
Conception
Charlotte, NC 28262

Grand Lake Village
New Construction
Design
Charlotte, NC 28208

Best Western Premier
New Construction
Design
Charlotte, NC 28208

Elon/ Hawk/ Polo Ridge Relief Recreation Site
Renovation - 14,000 SF
Bidding
$5,000,000 est. value
Charlotte, NC 28277

stayAPT Suites
New Construction - 59,895 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28269

Woodspring Suites
New Construction - 48,755 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28217

The Colony
New Construction - 550,000 SF
Construction
$400,000,000 est. value
Charlotte, NC 28211

The Colony
New Construction - 550,000 SF
Construction
$400,000,000 est. value
Charlotte, NC 28211

600 South Tryon at Legacy Union
New Construction, Renovation
Pending Verification
Charlotte, NC 28202

600 South Tryon at Legacy Union
New Construction, Renovation
Pending Verification
Charlotte, NC 28202

East West Station Office Building
New Construction - 393,000 SF
Conception
$10,000,000 CJ est. value
Charlotte, NC 28203

Norwood
New Construction - 21,152 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Charlotte, NC 28227

CVS #5463 Sitework and ADA Upgrades
Renovation, Alteration - 12,594 SF
Post-Bid
Charlotte, NC 28075

One Montford Park
Renovation - 146,000 SF
Construction
$6,000,000 to $7,000,000 est. value
Charlotte, NC 28209

Last Updated 06/24/2022 09:09 AM
Project Title

University City Entertainment District Phase III

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28262   (Mecklenburg County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Office, Parking Garage, Retail
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected June 2025
Bids Due View project details and contacts
Estimated Value $70,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a hotel, office building, and car dealership. As of June 23, 2022, this project is in the very early phases of development. Construction is not expected to begin for at least three years. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Retail, New Construction, Office, 150,000 SF New Construction, Hotel/Motel, New Construction, 150 Unit(s), Parking Garage, 4 Stories Above Grade, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents