Similar Projects
North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Design
Orem, UT

Kolob Canyons Water Tank & Distribution
Post-Bid
$1,000,000 to $5,000,000 est. value
New Harmony, UT 84757

Zone D - 5 Million Gallon Tank
Post-Bid
$5,000,000 to $6,000,000 est. value
Salt Lake City, UT

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Repair of Sewage Lift Pumps and Septic Tanks
Term Contract
Post-Bid
Price, UT

DFCM Construction-Standard Low Bid-Parks and Recreational Water Supply Improvements Gunlock Street Park-19326150
Results
Less than $180,000 est. value
Gunlock, UT 84733

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

TLWID Water Improvements Project 2019
Results
Less than $850,000 est. value
Lapoint, UT 84039

Boulder Farmstead Water Company Water Tank
Post-Bid
Less than $510,000 est. value
Boulder, UT 84716

Culinary Water Improvements for Elsinore Town
Results
Less than $2,000,000 est. value
Elsinore, UT 84111

Four (4) 1,000 Gallon Propane Tanks
Post-Bid
Blanding, UT 84511

Zone 2 Secondary Water Storage Reservoir
Results
Less than $1,000,000 est. value
Magna, UT 84044

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

Cathodic Protection Services
Results
Sandy, UT

Last Updated 12/28/2020 02:06 PM
Project Title

Zone 2 and 3 Tanks Project

Physical Address View project details and contacts
City, State (County) Herriman, UT 84096   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for the Zone 2 and Zone 3 Tanks Project includes the following elements: • Construction of two new 2 million gallon (MG), circular, AWWA D110 Type 1 prestressed concrete tanks (i.e. a 2 MG Zone 2 Tank and a 2 MG Zone 3 Tank). • Construction of vaults and yard piping improvement at each site, and connections to transmission piping at each site. • Excavation to construct the new tanks within the limits of each site; backfill and grading; construction of new access roads and site improvements at both sites. • Construction of tank instrumentation and controls for both tanks. • Site fencing and landscaping at each site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents