Similar Projects
RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

Livonia Public Schools Media Center Renovations - Technology - Bid Pack 04
Renovation
Bidding
$188,609 CJ est. value
Livonia, MI 48150

Grosse Pointe South IA Consolidation
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Grosse Pointe Park, MI 48230

BP 6 Innovation Center
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Redford, MI 48239

Tipton Academy Charter School
Renovation
Post-Bid
Garden City, MI 48135

Additions and Remodeling Work at Edison Hamilton and Schweitzer Elementary Schools
Renovation, Addition
Post-Bid
Westland, MI 48186

Burger Baylor Gutters Replacement
Alteration
Results
Inkster, MI 48141

BP 5 Secured Entries and BP 5A Bus Loop Improvements
Renovation, Infrastructure
Results
Romulus, MI 48174

Bobcean Elementary School - 2022 Bond - Flat Rock Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Flat Rock, MI 48134

Barnes Elementary School - 2022 Bond - Flat Rock Community Schools
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Flat Rock, MI 48134

BPT2 Districtwide Technology Improvements
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Redford, MI 48239

Summer 2022 Work Mason Elementary Renovation
Renovation
Post-Bid
Grosse Pointe Woods, MI 48236

Building Addition at Kinloch Elementary School
Addition, Demolition, Infrastructure, Renovation
Results
$2,575,000 CJ est. value
Dearborn Heights, MI 48127

Simpson Middle School - 2022 Bond - Flat Rock Community Schools
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Flat Rock, MI 48134

Livonia Public Schools Bid Pack 05 Livonia Early Childhood Center
Renovation - 72,000 SF
Sub-Bidding
$7,200,000 CJ est. value
Livonia, MI 48152

Last Updated 12/20/2022 07:03 PM
Project Title

Bid Package T5 Elementary Classroom AV

Physical Address View project details and contacts
City, State (County) Plymouth, MI 48170   (Wayne County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,214,151 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

P-CCS is requesting bid proposals for the purchase and installation of elementary-wide classroom technology items. Work will be coincide with construction additions/renovations when necessary, and P-CCS will work with the Contractor(s) to create a schedule to complete the Work sooner in areas with minimal impact from construction activities. Question Deadline 12/12/2022 at 3:00 PM ET Deadline for written requests for clarification Submit questions through the Messages tab in BuildingConnected (preferred) 2. Email to: brian.jessie@bartonmalow.com Project Locations: P-CCS Buildings related to the Work: 1. Bentley Elementary 1100 Sheldon Rd., Canton, MI 48188 2. Bird Elementary 220 Sheldon Rd., Plymouth, MI 48170 3. Dodson Elementary 205 N. Beck Rd., Canton, MI 48187 4. Eriksson Elementary 1275 N. Haggerty Rd., Canton 48187 5. Farrand Elementary 41400 Greenbriar Ln., Plymouth, MI 48170 6. Field Elementary 1000 S. Haggerty Rd., Canton, MI 48188 7. Gallimore Elementary 8375 Sheldon Rd., Canton, MI 48187 8. Hoben Elementary 44680 Saltz Rd., Canton, MI 48187 9. Hulsing Elementary 8055 Fleet St., Canton, MI 48187 10. Isbister Elementary 9300 Canton Center Rd., Plymouth, MI 48170 11. Miller Elementary 43721 Hanford Rd., Canton, MI 48187 12. Smith Elementary 1298 McKinley St., Plymouth, MI 48170 13. Tonda Elementary 46501 Warren Rd., Canton, MI 14. Workman Elementary 250 Denton Rd. N., Canton, MI 48187 15. Starkweather Academy Alternative 39750 Joy Rd., Plymouth, MI 48170 The Bid Proposal must be accompanied by a sworn and notarized disclosure in compliance with MCL 380.127 disclosing any familial relationship that exists between the bidder, or any employee of the bidder, and any member of the Board of Education of the school district or the Superintendent of the school district. Bid proposals that do not include this sworn and notarized disclosure statement will not be considered. The Board of Education reserves the right to: reject any or all bid proposals, either in whole or in part; waive any informalities or irregularities in the bidding process; accept bid alternates; and to award a contract in any manner deemed by the Board of Education, in its sole discretion, to be in their best interests.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents