Similar Projects
Bridge 00002 Repair by Replacement
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Connors Creek ATV Trail Bridge Replacement
New Construction, Infrastructure
Bidding
$160,000 est. value
Winter, WI 54896

Bridge Epoxy
Renovation, Term Contract
Bidding
WI

Snowmobile Bridge Replacement Spring Valley Creek - Dane 15 Bridge
New Construction, Infrastructure
Post-Bid
New Glarus, WI 53574

Snowmobile Bridge Replacement Spring Valley Creek - Dane 13 Bridge
New Construction, Infrastructure
Post-Bid
New Glarus, WI 53574

Snowmobile Bridge Replacement Mount Vernon Creek - Dane 9 Bridge
Results
New Glarus, WI 53574

Town of Ithaca, Mcavoy Hill Road, Little Willow Creek Bridge
Results
WI

The Couture Apartments
New Construction
Construction
Milwaukee, WI 53202

Eastman - Steuben, Kickapoo River Bridge, B-12-0195
New Construction, Infrastructure
Bidding
WI

CTH MB Bridge Replacement and Kenosha County Bridge Rehabilitation along Various County Highways
New Construction, Infrastructure
Post-Bid
WI

Cassville - Patch Grove, Structures
Results
Cassville, Patch Grove, WI 53806

Eau Claire - Osseo, CTH NN to East County Line
Renovation, Infrastructure
Bidding
WI

V. of Potosi, Brewery Hollow Road, Potosi Branch Bridge
Results
Potosi, WI 53820

2022 Lacy Road Bridge Maintenance
Renovation, Infrastructure
Bidding
Fitchburg, WI 53711

T. Casco, Elm Road, Rio Creek Bridge
Results
Casco, WI 54205

Reported 03/22/2022 09:42 AM
Project Title

Sonsalla Road over Tamarack Creek

Physical Address View project details and contacts
City, State (County) Trempealeau, WI 54661   (Trempealeau County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Structure construction, excavation common, base aggregate dense, asphaltic paving, restoration, erosion control, traffic control and all incidental items necessary to complete the work as shown on the plans and included in the special provisions. All work located on Sonsalla Road extends approximately 100-feet on each bridge approach.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents