Similar Projects
Children's Health System Specialty Center
Renovation - 32,000 SF
Design
Dallas, TX 75207

Pastoral Care Suite
Renovation - 2,000 SF
Design
$250,000 est. value
Dallas, TX 75235

South Campus Vivarium
Post-Bid
Dallas, TX 75235

Shell Build Out Level 14
Post-Bid
Dallas, TX 75200

WA1 Blood Lab, Cafe Modifications and WA1.702 OPB Reading Room
Renovation
Results
$486,500 est. value
Dallas, TX

HQ 2.3 Sleep Lab Check-In
Renovation - 150 SF
Results
$84,826 est. value
Dallas, TX 75390

Texas Scottish Rite Hospital for Children
Renovation - 3,600 SF
Construction
Dallas, TX 75219

Medical City Dallas NICU
Build-Out - 11,000 SF
Construction
Dallas, TX 75230

Medical City Dallas Central Sterile Department
Renovation, Addition - 25,830 SF
Pending Verification
$25,350,000 est. value
Dallas, TX 75243

Medical City Dallas Emergency Department
Renovation - 8,000 SF
Pending Verification
$5,400,000 est. value
Dallas, TX 75243

Steward Healthcare
Renovation
Design
$200,000 est. value
Dallas, TX 75201

Y1DA--Design and Construction of Pharmacy USP 800 Dallas, Texas
New Construction
Post-Bid
$1,000,000 to $2,000,000 est. value
Dallas, TX

Y--Reconfigure 2J Basement Floor for IT & Administration Space (VA-19-00046746)
Renovation
Results
$1,000,000 to $2,000,000 est. value
Dallas, TX 75216

Trinity Regional Hospital
New Construction - 80,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Sachse, TX 75048

Texas Scottish Rite Hospital for Children
Renovation - 4,445 SF
Pending Verification
$2,500,000 est. value
Dallas, TX 75219

Last Updated 02/08/2021 09:11 AM
Project Title

Nexaris Angio Build Out

Physical Address View project details and contacts
City, State (County) Dallas, TX 75390   (Dallas County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $628,599
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Buildout an existing shell to accommodate a new Siemens Nexaris – Zee Ceiling -CT sliding gantry equipment. To accommodate the Siemens equipment the existing room will be renovated and buildout to provide all the elements required. The areas partially affected will be room second floor Bio Med Tech Workstation 2.245 and third floor IR Supply 03.218 and Shared Control room 03.220.

Details

Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 08 - Openings.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Healthcare Lighting.
Division 31 - Earthwork, Site Clearing, Soil Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents