Similar Projects
Tsaile Kinyaa`Aani Library Restroom Renovation Project
Renovation
Post-Bid
Tsaile, AZ 86556

Elfrida Library Addition
Addition
Post-Bid
Elfrida, AZ 85610

Heritage District Redevelopment
Results
Surprise, AZ

White Tanks Library Tenant Improvements
Results
$420,000 est. value
Waddell, AZ 85335

Construction Manager at Risk for New Library Facility
New Construction
Results
Less than $8,000,000 est. value
Maricopa, AZ

Southeast Branch Library Building
New Construction - 9,000 SF
Construction
$2,250,000 to $2,750,000 est. value
Tucson, AZ 85747

Sahuarita Regional Library
Construction
$5,500,000 to $6,000,000 est. value
Tucson, AZ 85701

Library Improvements - Dobson Ranch and Main Library Kids’ Zone
Results
Mesa, AZ 85202

Library Expansion Construction
Addition - 1,795 SF
Post-Bid
Show Low, AZ 85901

Joel Valdez Main Library - 4th Floor Renovation
Renovation
Results
Less than $529,365 est. value
Tucson, AZ 85701

Reported 12/17/2020 12:00 AM
Project Title

Construction Manager at Risk Services for El Mirage Library Relocation / Remodel

Physical Address View project details and contacts
City, State (County) El Mirage, AZ 85335   (Maricopa County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value Less than $1,800,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project improvements include reconfiguration of the building’s interior, rework of the parking lot and play court, addition of parking lot lighting, removal of concrete driveways, installation of a wet tap for a fire sprinkler system, addition of a CMU trash enclosure, and improvements to the exterior to modernize the existing building.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents