Similar Projects
Business Hwy 141 (County Rd CP) Road Repairs
Post-Bid
WI

South 5th Road Improvements
Infrastructure
Post-Bid
Coleman, WI 54112

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pembine - Niagara, Crain Lane
Results
Niagara, Pembine, WI

Paving 5th Road
Infrastructure
Post-Bid
WI

Dunbar - Pembine, CTH O - USH 141
Results
Dunbar, Pembine, WI

Pulverizing
Infrastructure
Post-Bid
Amberg, WI 54102

Coleman Elm Drive Roadway Construction
Results
Coleman, WI 54112

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Colfax Street and Utility Reconstruction
Results
Marinette, WI 54143

Merryman Street and Pernin Street Reconstruction
Infrastructure
Post-Bid
Marinette, WI 54143

Dunlap Avenue Street and Utility Reconstruction
Results
Marinette, WI 54143

2022 Pavement Improvements
Infrastructure
Post-Bid
$150,000 est. value
Crivitz, WI 54114

Mill Street and Utility Reconstruction
Results
Marinette, WI 54143

Chip Seal on Sections of North 13th Road
Infrastructure
Post-Bid
$200,000 est. value
Pound, WI 54161

Last Updated 07/25/2022 04:09 PM
Project Title

TID #2 Development Storm Sewer and Roadway Construction

Physical Address View project details and contacts
City, State (County) Coleman, WI 54112   (Marinette County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $576,120 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work, in general, will include the approximate quantities and items listed below: 3,000 CY Roadway Excavation, 12,000 CY Storm Water Management Facility Excavation, 2,500 CY Crushed Aggregate Base Course, 1,300 LF of 12"-36" Storm Sewer with Manholes and Inlets, 9,000 SY Landscape Restoration, and Erosion Control Practices.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents