Similar Projects
Roadway Resurfacing
Bidding
$2,154,984 est. value

Airfield Pavement Rehabilitation and Marking
Post-Bid
Less than $250,000 est. value
Whitefield, NH

Resufacing Various Tier 2 Roadways in District 2
Results
Less than $2,308,737 est. value

Roadway Resurfacing
Results
Less than $3,147,361 est. value

Roadway Resurfacing
Results
Less than $2,288,400 est. value

Roadway Resurfacing
Results
Less than $3,430,566 est. value

Roadway Resurfacing
Results
Less than $2,708,783 est. value

Roadway Resurfacing
Results
Less than $5,272,453 est. value

Roadway Resurfacing
Results
Less than $2,386,277 est. value

Mt. Carberry Landfill Access Road Repairs
Results
Berlin, NH 03570

Hutchins Street Mill and Overlay Project
Results
Berlin, NH

Resurfacing of US 2 and NH 16
Results
Less than $1,062,353 est. value
Cambridge, Errol, Gorham, NH 03581

Resurfacing for US 3
Results
Less than $2,338,276 est. value
Columbia, Strafford, NH 03884

Slope Failure Repair and Possible Roadway Changes
Results
Stratford, NH

Crack Seal Various Tier 2 Roadway
Results
Less than $632,736 est. value

Last Updated 07/09/2020 10:31 AM
Project Title

Pavement Improvements

Physical Address View project details and contacts
City, State (County) Berlin, NH 03570   (Coos County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $625,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will rehabilitate the main access road to the Prison and construct drainage improvements to the perimeter roadway. The main access road will be rehabilitated by reclaiming the existing pavement, then graded and paved. The roadway will also require reconstructing the stone lined slopes and drainage swales with underdrains along the edge of the road. The perimeter road will have a new underdrain and stone lined swale installed, along the cut-side of the roadway. The main access road will need to be completed so that the Prison can continue running under normal day to day operations. Permits and traffic control plans will be required for the project. The awarded Contractor will be required to have all employees working on-site submit to background checks prior to working. See sections 002500 Special Conditions, and 01100 Summary, for more information regarding the facilities’ entry controls and use of the site.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents