Similar Projects
Combined Sewer Main Relay
Infrastructure
Bidding
$300,000 est. value
Milwaukee, WI

On-Call Construction Services for Sewer Repair and Rehabilitation
Term Contract
Post-Bid
Milwaukee, WI

Combined Sewer Overflow (CSO) 195 Relocation
Renovation
Post-Bid
Milwaukee, WI

Sanitary Sewer Lining, Spot Lining and Grouting
Results
Less than $401,394 est. value
West Allis, WI

2021 Sanitary Sewer Lining
Results
Shorewood, WI

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

2021 Manhole Rehabilitation
Results
Shorewood, WI

Sewer Construction
Post-Bid
Milwaukee, WI

Sanitary Sewer Main Repair and Lining and Manhole Repair and Lining
Results
Milwaukee, WI 53200

Combined Sewer Main Relay & Combined Sewer Lining and Manhole Repair & Lining
Post-Bid
Milwaukee, WI

2021 Sanitary and Storm Sewer CIPP Rehabilitation
Results
Bayside, WI 53217

DC0101 Gate Replacements
Post-Bid
Milwaukee, WI 53221

2021 Sanitary and Storm Sewer CIPP Rehabilitation
Results
Fox Point, WI

Sanitary Sewer Main Relay and Combined and Sanitary Sewer Lining
Infrastructure
Post-Bid
Milwaukee, WI 53288

2021 Sanitary Sewer Rehabilitation Program
Results
Oak Creek, WI

Reported 06/07/2022 07:51 AM
Project Title

Jones Island Water Reclamation Facility Bldg. 225 Air Compressor Repairs

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53207   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a water / sewer project in Milwaukee, Wisconsin. Completed plans call for the renovation of a water / sewer project. Site Directions: Veolia Water Reclamation Facility Jones Island Water Reclamation Facility 700 East Jones Street Milwaukee, WI 53207 The project contemplated herein consists of the contractor performing repairs to four (4) Process Air Compressors (PACs). All contractor and subcontractor employees shall obtain specific site plant safety training from Veolia Water prior to working on the site. Veolia Water will offer a total of two onehour training sessions to the contractor and any subcontractors. The Contractor shall adhere to all Veolia Water safety policy and procedures. Questions pertaining to the proposed work should be directed to Larry Koch, (412) 417-0431 The time for completion of the Contract shall be one hundred and eighty (180) days from the date of Notice to Proceed. Veolia Water reserves its rights to reject any Bid, to reject all Bids, and any bid not conforming to the intent of the invitation for bids and to postpone the award of the Contract for a period of time not exceeding (45) days from the bid opening date. Bids shall remain firm and may not be withdrawn during this forty-five (45) day period. Veolia Water reserves its rights to waive any informality or deficiency in any Bid, to accept any Bid, to negotiate modifications of any Bid with any Bidder and accept any modified Bid, and to rebid the Project, all at Veolia Water's sole discretion.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents