Similar Projects
Village Center
New Construction - 540,431 SF
Conception
Los Ranchos de Albuquerque, NM

Top Crop Cannabis Store
Renovation
Conception
Albuquerque, NM 87112

Murphy Express
New Construction
Design
Albuquerque, NM 87111

Murphy Express #8969
New Construction - 2,800 SF
Design
Albuquerque, NM 87114

Construction Services for West Central Fire Station 37
New Construction, Infrastructure - 12,000 SF
Bidding
$8,275,000 CJ est. value
Albuquerque, NM 87102

Joan Jones Community Center at Atrisco Hills Addition Phase 2
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Albuquerque, NM 87105

ASL Asphalt Entrance Rebuild
Post-Bid
$10,000,000 est. value
Albuquerque, NM 87117

APS Bituminous Paving
Infrastructure
Results
Albuquerque, NM

Roadway Reconstruction, Lighting, Signalization, ITS
Infrastructure
Results
NM

Hiland Plaza
New Construction, Infrastructure - 2,000 SF
Construction
$18,000,000 CJ est. value
Albuquerque, NM 87108

Hiland Plaza
New Construction, Infrastructure - 2,000 SF
Construction
$18,000,000 CJ est. value
Albuquerque, NM 87108

Mexican Restaurant
Renovation - 8,250 SF
Pending Verification
$45,000 est. value
Albuquerque, NM 87111

Highland High School - 2021 Bond - Albuquerque Public Schools District
New Construction, Infrastructure
Pending Verification
$27,957,586 CJ est. value
Albuquerque, NM 87108

Tope Crop Cannabis Store
Renovation
Conception
Albuquerque, NM 87110

Autozone #1935
New Construction
Design
Albuquerque, NM 87114

Last Updated 03/08/2023 05:12 PM
Project Title

Murphy Express #8969 / Albuquerque

Physical Address View project details and contacts
City, State (County) Albuquerque, NM 87121   (Bernalillo County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Retail, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a gas station/convenience store. The project site is located at the intersection of Unser Blvd & McMahon Blvd. As of March 8, 2023, the project is no longer on the planned sites list. ***THE OWNER REQUESTS ABSOLUTELY NO EMAIL AND NO PHONE INQUIRIES*** INQUIRIES MAY RESULT IN DISQUALIFICATION FROM FUTURE VENDOR OPPORTUNITIES.

Details

1 Story Above Grade, 2,800 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents