Similar Projects
(3.42-mile) Design Overlay Project on IL Route 137 From Buckley Road to Belvidere Road That Includes ADA Curb Ramp Improvements
Infrastructure
Bidding
IL

Construction of a Pedestrian Path Along Hart Road From Field of Dreams to Lake Cook Road
Infrastructure
Bidding
$600,000 est. value
IL

Central HS Parking Lot Improvements North HS Courtyard Improvements
Post-Bid
Grayslake, IL 60030

2021 Landscape Services
Post-Bid
Highland Park, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Concrete Curb & Gutter, Road Resurfacing, Sidewalk
Results
Less than $155,000 est. value
Highwood, IL 60040

Shepard Park Improvements
Renovation, Infrastructure
Bidding
$360,000 est. value
Deerfield, IL

2021 Curb and Sidewalk Program
Post-Bid
Grayslake, IL

ADA Improvement Project along Various State Maintained Routes
Results
Fox Lake, Grayslake, Lake Villa, Richmond, Winthrop Harbor, IL

Reed Turner Parking Lot Improvements
Infrastructure
Bidding
$200,000 est. value
Long Grove, IL 60047

2021 Parking Lot Improvements at Lakes Community& Antioch HS
Post-Bid
Antioch, Lake Villa, IL 60002

(5.660-Mile) Improvement on IL-173 (Rosecrans Road) from MC Henry Co
Results
Antioch, IL 60002

Removing and Replacing 48 Curb Ramps
Post-Bid
Libertyville, IL

(4.176-Mile) Resurfacing (Smart Overlay), ADA Improvements
Results
North Chicago, Waukegan, IL 60064

2021 Sidewalk Replacement
Post-Bid
Gurnee, IL

Last Updated 04/18/2022 09:27 AM
Project Title

2022 Moraine Park Path Improvements

Physical Address View project details and contacts
City, State (County) Highland Park, IL 60035   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing stone path and retaining walls, and replacement with approximately 250 feet of five-foot-wide boardwalk. The project will also include helical piles, helical tie backs, gabion baskets at ravine shoreline, boulder placement, construction fencing, tree protection and restoration of all disturbed areas. The scope of work includes all necessary workmanship to satisfactorily complete the work as required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents