Similar Projects
Nugent Park Playground Replacement - City of Umatilla
Renovation, Infrastructure
Conception
$576,000 CJ est. value
Umatilla, OR 97882

Umatilla Marina & RV Park Improvements - Design Phase - City of Umatilla
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Umatilla, OR 97882

US 730/4.4 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$2,721,000 CJ est. value
McNary, OR 97882

Eastern Oregon variable message signs
Infrastructure
Design
$1,069,175 CJ est. value
Pendleton, OR 97801

WWTRRF Primary Clarifier Coating Project
Infrastructure
Bidding
$68,000 CJ est. value
Pendleton, OR 97801

SE 3rd Street Reconstruction
Infrastructure
Bidding
$913,750 CJ est. value
Pendleton, OR 97801

RFQ Contractor - McNary Dam Navigation Lock Crane Replacement
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Umatilla, OR 97882

Camp Umatilla Entry Gate Improvements - Phase 2 and 3
New Construction, Infrastructure
Post-Bid
$2,479,000 CJ est. value
Hermiston, OR 97838

Regional Water System Improvements Phase 1 - 2023
Renovation, Infrastructure
Results
$2,808,813 CJ est. value
Hermiston, OR 97838

OR204: Little Phillips Creek Emergency Culvert Replacement Project Weston-Elgin Highway
Infrastructure
Results
$1,349,483 CJ est. value
Weston, OR 97886

South Hill Commons - New Multi-family Affordable Housing Project
New Construction, Infrastructure - 172,202 SF
Construction
$47,000,000 CJ est. value
Pendleton, OR 97801

Sterling Ridge Apartments
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hermiston, OR 97838

Horizon Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hermiston, OR 97838

Pendleton Signal Upgrade Project Phase II
Infrastructure
Design
$1,510,129 CJ est. value
Pendleton, OR 97801

McLoughlin High School - Milton Freewater Unified School District
New Construction, Infrastructure
Post-Bid
$2,700,000 CJ est. value
Milton Freewater, OR 97862

Last Updated 07/25/2023 08:23 AM
Project Title

RFP Engineering - Design Mottet Creek Valley Restoration

Physical Address View project details and contacts
City, State (County) Pendleton, OR 97801   (Umatilla County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected July 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide an engineered conceptual 30% level design and design report for FSR 63 crossing Mottet Creek that corrects AOP barriers and advances valley restoration concepts meeting U.S. Forest Service, National Marine Fisheries Service and US Fish and Wildlife Service ARBO II, U.S. Forest Service Manual 7000 (specifically section 7700-Transportation Systems), and Oregon Department of Fish and Wildlife criteria for AOP and valley bottom/floodplain restoration. The project reach is in the Umatilla National Forest (Sec.33 T04N R39E) where FSR63 crosses Mottet Creek. Mottet Creek flows from Jubilee Lake approximately 5 miles upstream of the crossing with FSR 63, then continues 1.5 miles downstream to its confluence with the Little Lookingglass Creek. Work Description: The contractor will collaborate with TSS and stakeholders to develop design alternatives to address the project goal. A process for ranking alternatives will be developed. A preferred alternative will be selected by TSS and the stakeholders. The contractor will provide all staff, labor, equipment, and materials necessary to complete the following scope of work. Scope of Work: This tentative scope of work may be modified during contract negotiations with the contractor. We will rely on the expertise of the consultant to determine the appropriate data collection and analyses. However, we expect this to include the following list. • Kickoff meeting with TSS to visit the project area and review project schedule and tasks • Introductory meeting, and up to three total meetings with stakeholders • Regular check-in meetings with TSS staff (such as every-other-week, or monthly) • Gathering of relevant background materials, such as maps, plans, history, inventories • Topographic surveying • Field investigations of geotechnical and other site conditions • Hydraulic, hydrologic, and geomorphic analysis • Sediment budget • Consultation with archaeologists • Data interpretation to inform alternatives • Development of design alternatives • Data analysis and preparation of drawings and designs • Presentation materials, as necessary, for stakeholder meetings • Preparation of a final assessment report that includes a conceptual design of the preferred alternative Although a firm timeline for construction has not been determined, construction is not expected to commence prior to July 2024. Completion is expected by November 1, 2024.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents