Similar Projects
New Backflow Preventer/Meter Vault and Appurtenance
Infrastructure
Bidding
$105,000 est. value
Hamilton, MA

Water Main Replacement Project
Infrastructure
Bidding
$2,500,000 est. value
Danvers, MA 01923

Install Commercial Water Meters in Brooksby Village
Post-Bid
Less than $95,000 est. value
Peabody, MA 01960

Highland Avenue Water Lining
Post-Bid
Less than $600,000 est. value
Salem, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Market Street Utility Project
Results
Less than $700,000 est. value
Ipswich, MA 01938

Water Meter Installation Program
Infrastructure
Bidding
Lynn, MA

Advanced Metering Infrastructure (AMI) Replacement
Infrastructure
Post-Bid
Ipswich, MA

2020 Chandler Road Water Improvements
Results
Less than $800,000 est. value
Andover, MA 01810

Ductile Iron Pipe
Infrastructure
Post-Bid
Beverly, MA

Furnish and Install Metron-Farnier Spectrum 500D Water Meters
Results
Ipswich, MA

Purchase of Water Meters
Term Contract
Results
North Andover, MA

Contract 2 - 2020 Water Main Improvements
Results
Less than $3,400,000 est. value
Andover, MA 01810

Gloucester Dams Gatehouse Improvements
Results
Less than $790,000 est. value
Gloucester, MA

Water Meters and Related Hardware
Results
Less than $180,000 est. value
Gloucester, MA

Last Updated 02/10/2022 09:15 AM
Project Title

Bear Hill Road Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Merrimac, MA 01860   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $775,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the removal of 6-inch cast iron water main and replacement with 12-inch ductile iron water main, approximately 5,050 linear feet on Bear Hill Road. There is an additional alternate work item for full width paving within project limits on Bear Hill Road.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents