Similar Projects
Martin Luther King, Jr. Boulevard Sidepath - 508-122 - City of Baltimore
Infrastructure
Conception
$868,000 CJ est. value
Baltimore, MD 21201

Metro West/Route 40 Street Realignment - 601-096 - City of Baltimore
Infrastructure
Conception
$1,000,000 CJ est. value
Baltimore, MD 21202

Harlem Park Apartments Renovation and Addition
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Baltimore, MD 21223

Harford Road Multi-Residential
New Construction, Infrastructure
Design
$56,000,000 CJ est. value
Baltimore, MD 21214

Curb Repair Citywide
Infrastructure
Bidding
$800,000 CJ est. value
Baltimore, MD 21202

GMP II Sitework and Structural Package - Cross Country Elementary/Middle School
Infrastructure
Post-Bid
Baltimore, MD 21215

HC Properties Phase I - Plan A and Plan B
Build-out, Infrastructure - 94,412 SF
Post-Bid
$10,000,000 CJ est. value
Baltimore, MD 21230

Drainage Outfall Rehabilitation
Infrastructure
Results
$2,793,273 CJ est. value
Baltimore, MD 21202

Airfield Lighting Vault Relocation at BWI Thurgood Marshall Airport
Infrastructure, Renovation
Results
$23,997,000 CJ est. value
Baltimore, MD 21202

RFQ D/B - Howard Street Tunnel Project
New Construction, Infrastructure
Construction
$466,000,000 CJ est. value
Baltimore, MD 21217

Monroe Circle Multi Family Buildings
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Baltimore, MD 21225

North Avenue Mixed-Use Development / Baltimore
New Construction, Infrastructure - 41,450 SF
Pending Verification
$200,000,000 CJ est. value
Baltimore, MD 21217

LiDL - Northwood Commons / Baltimore
Demolition, New Construction, Infrastructure - 30,000 SF
Pending Verification
$8,000,000 CJ est. value
Baltimore, MD 21218

Gwynns Falls Phase II Sewershed Improvements - 551-071 - City of Baltimore
Infrastructure
Conception
$106,941,000 CJ est. value
Baltimore, MD 21216

The Promenade at Catonsville
New Construction, Infrastructure - 1,100,000 SF
Design
$300,000,000 CJ est. value
Baltimore, MD 21224

Last Updated 03/29/2023 04:34 PM
Project Title

Baltimore City District Court

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21202   (Baltimore City County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $68,065,318 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

New Baltimore City District Court. VSBE Participation (%) 5.0 MBE Participation (%) 40.0 African American MBE Participation (%) 8.0 Women-Owned MBE Participation (%) 11.0 The work shall be completed within 1,460 calendar days; liquidated damages of $2,500.00 per calendar day

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents