Similar Projects
2020 Sinking Fund Projects-Middle School Gym Partial Re-Roof
Alteration
Bidding
Walkerville, MI

Flat Roof Repairs for the Waterford Office
Alteration
Bidding
Waterford Township, MI 48328

Enterprise High School Roof
Post-Bid
Warren, MI 48088

Roof Replacement for Riley Elementary
Post-Bid
Dewitt, MI

Partial Roof Replacement - Marysville Middle School
Results
Marysville, MI

Roof System Replacement at Northeastern Elementary School
Results
Kalamazoo, MI

Roof Inspection, Maintenance and Minor Repairs
Post-Bid
Detroit, MI

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

2020 Reroof Project
Post-Bid
North Muskegon, MI

Grain Elevator Roofing
Results
Portage, MI

DPS Roof
Post-Bid
Garden City, MI 48135

2020 Partial Roof Replacement
Results
Auburn Hills, MI

County Building Roof Resurfacing and Repair
Post-Bid
Sault Sainte Marie, MI

Rutherford Pool Roof Replacement
Results
Ypsilanti, MI

New Station No. 1- EPDM Membrane Roofing
Post-Bid
Whitehall, MI 49461

Last Updated 08/20/2021 03:52 PM
Project Title

Golf Starter Low Slop Roof Replacement

Physical Address View project details and contacts
City, State (County) Dexter, MI 48130   (Washtenaw County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Completely remove and replace the roof system with fully-adhered, reinforced 60 mil EPDM single-ply roof membrane on roof and adjoining walls and parapet. 2. Install new flat stock and/or tapered isocyanurate insulation; mechanically fasten the base layer, adhere the top layer in foam adhesive. NOTE: the top layer of insulation is to be a 4-way tapered system. Minimum R-value: R-20. 3. Install new sheet metal penetration flashings, roof curb cap flashing, counterflashing, gutter and downspouts. 4. Provide the Owner with a 20-year total system warranty from the selected membrane manufacturer

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents